Title Page

  • Project

A

  • undefined

undefined

  • Site conducted

  • Block

  • Phase

  • Floor

  • Location
  • Room

  • Drawings

  • Other reference documents

  • Conducted on

  • Prepared by

INSTALLATION

Control points

  • Pipes installed as per drawing

  • Pipe sizes correct

  • Spacing of supports checked

  • Valves installed and accessible

  • Pressure testing completed

  • Pressure test results available

  • MS present for witness testing

  • Lagging complete after preliminary pressure testing

  • General installation seems tidy

  • Any comments

  • Reviewed by (Name, Signature & Sign Date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.