Title Page

  • Project

  • undefined

undefined

  • Site conducted

  • Block

  • Phase

  • Floor

  • Location
  • Room

  • Drawings

  • Other reference documents

  • Conducted on

  • Prepared by

INSTALLATION

Control points

  • Cables installed as per drawing

  • Cables size correct

  • Cable Type correct (BS Type)

  • Cable segregation as per drawing.

  • Containment size correct

  • Cables Installed in correct Zoning As required in BS7671

  • Cables coiled, ready for termination

  • Cables pulled straight and dressed properly on the relevant containment.

  • Ensure that minimum required bending radius of installed cables is observed.

  • Ensure all temporary tie-wraps have been removed and secured with

  • permanent tie-wraps

  • Cable markers installed.

  • Cables sealed against ingress

  • Cables installed ready to close up walls

  • Reviewed by (Name, Signature & Sign Date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.