Information
-
Document No.
-
Audit Title
-
Location
-
Conducted on
-
Unit Call Sign
-
Team Leader
-
Members
Hazards
People
-
Are all members working on the task competent in Working Safely at Heights?
-
Are all members working on the task rested?
-
Are all members working on the task hydrated?
Power
-
What source of power has been identified
- Grid
- Solar
- Generator
- Battery
- Other
-
Does the power need to be isolated at the pole?
-
Stop the job until Power provider or qualified person shuts down the power
-
Has the power been isolated?
-
Is there any further hazards associated with this? List hazard and control.
-
Has the power been isolated to the house?
-
Stop the job until power has been isolated.
-
Is there any further hazards associated with this? List hazard and control.
-
Has the isolator for the panels been turned off?
-
Has the solar panels been covered and left to discharge for 5 minutes?
-
Cover the solar panels before commencing work
-
Is there any further hazards associated with this? List hazard and control.
-
Isolate the switch, usually near the metre box.
-
Has the generator been shut down?
-
Shut down the generator before commencing
-
Is there any further hazards associated with this? List hazard and control.
-
Has the battery system been shut down?
-
Shut down the battery system before commencing task
-
Is there any further hazards associated with this? List hazard and control.
-
Is there any further hazards associated with this? List hazard and control.
Environment
-
What are the environmental conditions?
- Rain
- Lightning
- Wind
- Humidity
- Heat
- Cold
-
Rain: Are all members wearing the correct PPE for the task?
-
Rain: Is there any further hazards or controls associated with this? List here
-
Lightning: Postpone the job until safe or avoid working at heights
-
Lightning: Is there any further hazards or controls associated with this? List here
-
Wind: Is there any further hazards or controls associated with this? List here
-
Wind: Is it possible to avoid working at height?
-
Document controls for working at height in windy conditions
-
Humidity: Do all crew members have the correct PPE? Ensure members have rotated rest breaks
-
Humidity: Is there any further hazards or controls associated with this? List here
-
Heat: Ensure all crew members are rested and have regular drink breaks
-
Heat: Is there any further hazards or controls associated with this? List here
-
Cold: Do all crew members have the correct PPE? Ensure members have rotated rest breaks
-
Cold: Is there any further hazards or controls associated with this? List here
Roof
-
What is the height at the lowest point?
-
What is the angle of the roof?
-
What material is the roof made of?
-
What is the condition of the roof?
-
What controls for a poor roof condition will you implement?
Hazards
-
Is there a risk from near by trees?
-
Is there safe access, no obstructions around the proposed ladder site?
-
Is there a risk from traffic? pedestrian or vehicles?
-
Are the ground conditions safe? Not slippery or too uneven?
-
Is there sufficient lighting for the task?
-
Add additional hazards identified not covered in this risk assessment.
Hazards
Plan
Planning
-
Draw diagram if required
-
You can draw on the photos using the annotations feature, open picture after taking photo
-
Take photo of work area.
-
To take a screenshot on your phone of a satellite image, click the link below, select satellite image and take a screenshot, you can add this above and add annotations if required. Internet cost will apply.
https://www.google.com.au/url?sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=0CCMQFjAB&url=https%3A%2F%2Fmaps.google.com%2F&ei=05j2VIbNKcLNmwWRooHYAQ&usg=AFQjCNFuPY2Aj2NOPEsGecppA7LUkWB7YA&sig2=miJaQfoU5Ut3Vpo1gXTBsg&bvm=bv.87519884,d.dGY -
Any additional information about this task?
-
Team Leader