Title Page
-
Inspector:
-
Supervisor:
-
Company:
-
Location:
-
Date:
INSPECTION
-
JobSTART has been completed detailing all Underground hazards, with suitable control measures in place?
-
Is a valid permit (Permit to Dig) in place for the work being performed?
-
Is there a ‘Dial Before You Dig’ drawing showing the location of underground services?
-
Has a site survey been carried out to identify surface indicators of utilities, for example light posts, valve pits, pit covers?
-
Have suitable cable and pipe locating devices been used to confirm position of the utilities (remember these devices can’t detect plastic pipes)?
-
Has ongoing verification of services been undertaken through test holes or similar?
-
Have underground services been marked on the surface with cones, paint, signs or similar?
-
Is a Spotter in place when penetrating ground around underground utilities?
-
Positive radio communication is available between spotter and plant operator?
-
Are all workers kept clear of the plant while stabilising, drilling or digging work is conducted in the vicinity of utilities?
-
Are exposed services adequately supported/protected?
Inspection Team
-
Signature:
-
Signature:
-
Signature: