Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Daily Checklist (To Be Completed prior to leaving)
-
All Roller Door are to be closed
-
Inspect outside Workshop to ensure that all Workshop controlled areas are clean, parts are secure
-
All Workshop specialised tooling (Computers are on charge, Tools on Shadow Boards)
-
Reset Shadow boards as required
-
All Workshop Equipment (Forklifts refilled and EWP is on charge) are to parked in designated areas
-
Workshop Battery Carts (EBS/Light Cart) are place on Charge
-
EWP (324) Check Water level on Tuesday and Thursday
-
All Door are locked
-
All Lights Off
-
Tyre Shed - All Doors are locked