Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Daily Checklist (To Be Completed prior to leaving)

  • All Roller Door are to be closed

  • Inspect outside Workshop to ensure that all Workshop controlled areas are clean, parts are secure

  • All Workshop specialised tooling (Computers are on charge, Tools on Shadow Boards)

  • Reset Shadow boards as required

  • All Workshop Equipment (Forklifts refilled and EWP is on charge) are to parked in designated areas

  • Workshop Battery Carts (EBS/Light Cart) are place on Charge

  • EWP (324) Check Water level on Tuesday and Thursday

  • All Door are locked

  • All Lights Off

  • Tyre Shed - All Doors are locked

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.