Information

  • Project

  • Conducted on

  • Prepared by

  • Location
  • Contractors on site

  • Number of personnel on site

  • Document No.

Pre-Inspection Review

  • Previous Inspection Review

  • Has the previous inspection report been closed out?

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Have all previous corrective actions been completed?

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

Public Safety and Security

  • Public Exposed to Site

  • Site perimeter secure

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Public protected from construction hazards

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Adequate signage

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

Orientation

  • Site Specific Orientation Required?

  • Young or new worker orientation provided [OHSR 3.23]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Record of orientation [OHSR 3.25]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

First Aid

  • First Aid Provisions Required

  • First aid attendant qualification [OHSR 3.15]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • First aid procedures [OHSR 3.17]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • First aid communication method in place [OHSR 3.18]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • First aid records [OHSR 3.19]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

General Conditions

  • General Conditions Reviewed

  • Safe building and structures [OHSR 4.2]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workplace illumination levels [OHSR 4.65]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Emergency lighting in place if required [OHSR 4.69]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Discharge air away from workers and public [OHSR 4.77]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Indoor air quality free of contaminants [OHSR 4.72]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Indoor temperature and humidity within acceptable comfort zone [OHSR 4.80]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Environmental Tobacco Smoke controlled [OHSR 4.81]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • • Prohibited in workplace
    • Outdoor smoking area designated (min 3 meters from an opening to an indoor workplace)

  • Eating area hygiene [OHSR 4.84]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Washroom facilities sufficient in number [OHSR 4.85 (1)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Washroom facilities in proper working order, clean, sanitary, and supplied [OHSR 4.85 (3)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Non-potable water sources notices in place as required [OHSR 4.87]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Noise hazard warning signs in required areas [OHSR 7.7 (1)(b)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Equipment, Machinery, and tools on Site

  • Safe machinery and equipment [OHSR 4.3]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Machinery, equipment and tools manuals available [OHSR 4.5]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Machinery, equipment and tools inspection and maintenance records [OHSR 4.9]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Machinery, equipment and tools safeguards [OHSR 4.12]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Curb installed where danger of vehicle or equipment running off edge of elevated area exists [OHSR 4.63]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Work Area Requirements

  • Work Area Requirements Reviewed

  • Access to work areas [OHSR 4.32]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Arrangement of work areas [OHSR 4.33]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Restricted entry to hazardous areas [OHSRS 4.34]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Extreme temperature hazards isolated [OHSR 4.38]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Slipping and tripping hazard control [OHSR 4.39]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Waste material removal/control [OHSR 4.41]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Wet floor control [OHSR 4.40]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Storing and Handling Materials

  • Storange and Handling of Materials Reivewed

  • Material stacking (stable, secure) [OHSR 4.43]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Entrapment or engulfment risk controlled [OHSR 4.44]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Falling materials prevention [OHSR 4.45]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

Ergonomics

  • Workplace Ergnomics Reviewed

  • Ergonomic Risk assessment [OHSR 4.48]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Ergonomic Risk Control [OHSR 4.50]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Work Area Guards and Handrails

  • Work Area Guards and Handrails Reviewed

  • Guardrails have top rail 102cm to 112 cm (40 in to 44 in) above work surface and midrail midway [OHSR 4.54]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Guardrails in work areas above 122 cm (4 ft) [OHSR 4.55 (a)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Guardrails on both sides of walkways with substance or machinery fall hazards [OHSR 4.55 (b)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Guardrails around any containment area over 122 cm (4 ft) [OHSR 4.44 (c)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Guardrails in place if a stairway ends in direct proximity to dangerous traffic or other hazards [OHSR 4.55 (d)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Additional guardrails added if required due to worker elevation [OHSR 4.57]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Floor and roof openings securely covered or guarded [OHSR 4.59]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Toeboards in place if danger of tools, materials, equipment or debris falling or a danger of slipping off the work surface exists [OHSR 4.60]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Elevated walkways 50 cm (20 in) wide minimum [OHSR 4.61]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Stairways with more than 4 risers have continuous handrails [OHSR 4.62]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Emergency Preparedness and Response

  • Emergency Preparedness Reviewed

  • Workplace risk assessment [OHSR 4.13]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Emergency procedures [OHSR 4.14]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Emergency training [OHSR 4.16]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Chemical and Biological Agents

  • Hazardous Materials on Site

  • Safety Data Sheet (SDS) readily available for all hazardous materials [OHSR 5.16]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Workplace labels on decanted products [OHSR 5.10]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Hazardous material containers sealed if not in use [OHSR 5.22]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Incompatible materials stored separately [OHSR 5.24]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Hazardous material storage area [OHSR 5.26]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Hazardous material inventory [OHSR 5.98]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Hazardous substance exposure controlled within exposure limits [OHSR 5.48]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Emergency washing facilities available if worker’s eyes or skin may be exposed to harmful or corrosive materials [OHSR 5.85]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Emergency plan [OHSR 5.97]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Flammable or Combustible Materials on Site

  • Ignition sources controlled during flammable material handling [OHSR 5.27]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Conductive (Metallic) containers grounded and bonded if transferring flammable material [OHSR 5.28]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Containers with substances under pressure protected [OHSR 5.36]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Compressed gas cylinders handling and securing [OHSR 5.38]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Personal Protective Equipment

  • Personal Protective Equipment Reivewed

  • Workers wearing hearing protection when required [OHSR 7.7 (2)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Safety headgear worn in work areas where there is a danger of head injury from falling, flying or thrown objects [OHSR 8.11]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers wearing safety eyewear appropriate to the conditions of the workplace [OHSR 8.14]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers wearing face protection when at risk of a face injury [OHSR 8.17]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers wearing appropriate skin, hand, foot or body protection if exposed to a substance or condition which is likely to harm the skin [OHSR 8.19]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Leg protection worn by workers operating a chain saw [OHSR 8.21]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers wearing appropriate protective footwear [OHSR 8.22]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers exposed to vehicles travelling at speeds greater than 30 km/h wearing Type 1 or Type 2 high visibility clothing [OHSR 8.24 (2)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers exposed to mobile equipment wearing at minimum Type 3 high visibility clothing [OHSR 8.24(3)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers exposed to the risk of drowning wearing a personal flotation device (PFD) [OHSR 8.26]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers exposed to flash fires, molten metal, welding or burning operations wearing required flame resistant clothing [OHSR 8.31]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers exposed to air contamination that exceeds the exposure limits wearing appropriate respiratory protection [OHSR 8.32]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Traffic Control

  • Traffic Control Required

  • Traffic control management plan

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Traffic control person qualifications

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Traffic control set up

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Fall Protection

  • Worker required to work at heights

  • Fall protection system in use by workers exposed to a fall hazard equal or greater than 3 m (10 ft) [OHSR 11.2 (1)(a)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Worker training in fall protection verified.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Fall protection plan in place if workers may be exposed to a fall hazard equal or greater than 7.5 m (25 ft) exists [OHSR 11.3]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Protection from falling materials in place where required.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Workers at heights have tethered equipment, or established a control zone below to prevent or protect others in the event work materials, or equipment were to fall.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Ladders, Scaffolding, Elevated Work Platforms

  • Ladders used in the workplace

  • Ladders marked for the grade of material and the use [OHSR 13.4]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Portable ladders used are appropriate length for the work, and place on firm and level surface [OHSR 13.5 (1)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Portable non-self supporting ladder positioned at approximately 75° from the horizontal plane of support [OHSR 13.5 (2)(a)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Ladders providing access to or egress from an upper landing project approximately 1 m (3 ft) and sufficiently secured in place [OHSR 13.5 (2)(b)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Scaffold

  • Scaffold in safe condition and able to withstand load [OHSR 13.13]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Scaffold connections between part secured [OHSR 13.18]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Scaffold effectively grounded if in close proximity to high voltage conductors or equipment [OHSR 13.1]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Construction, Excavation, and Demolition

  • General Requirements Reviewed

  • Qualified Contractor [OHSR 20.1A]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Notice of project posted on site [OHSR 20.2]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Qualified coordinator for the purpose of ensuring the coordination of health and safety activities apoointed. [OHSR 20.3(2)(a)(i)

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • All contractors on site have appointed a qualified person to be responsible for their health and safety activities. [OHSR 20.3(2)(b)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • 20.3 Coordination of multiple employer workplaces

    (1) If a construction project involves the work of 2 or more employers or their workers, each employer must notify the owner, or the person engaged by the owner to be the prime contractor, in advance of any undertaking likely to create a hazard for a worker of another employer.

    (2) If a work location has overlapping or adjoining work activities of 2 or more employers that create a hazard to workers, and the combined workforce at the workplace is more than 5,

    (a) the owner, or if the owner engages another person to be the prime contractor, then that person must

    (i) appoint a qualified coordinator for the purpose of ensuring the coordination of health and safety activities for the location, and

    (ii) provide up-to-date information as specified in subsection (4), readily available on site, and

    (b) each employer must give the coordinator appointed under paragraph (a)(i) the name of a qualified person designated to be responsible for that employer's site health and safety activities.

    (3) The duties of the qualified coordinator appointed under paragraph (2)(a)(i) include

    (a) informing employers and workers of the hazards created, and

    (b) ensuring that the hazards are addressed throughout the duration of the work activities.

    (4) The information required by subsection (2)(a)(ii) includes

    (a) the name of the qualified coordinator appointed under subsection (2)(a)(i),

    (b) a site drawing, which must be posted, showing project layout, first aid location, emergency transportation provisions, and the evacuation marshalling station, and

    (c) a set of construction procedures designed to protect the health and safety of workers at the workplace, developed in accordance with the requirements of this Regulation.

  • Site drawing posted, showing project layout, first aid location, emergency transportation provisions, and the evacuation marshalling station (muster location) [OHSR 20.3(4)(b)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Safe Work Areas and Safe Access

  • Safe access [OHSR 20.4]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Temporary floors [OHSR 20.5]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • (1) During the erection of a building or structure of skeleton construction, a temporary floor, decking or formwork must be installed at the main working level where work is being done.
    (2) If compliance with subsection (1) is not practicable, a temporary floor or other effective means of protection must be installed not more than two levels or 8 m (25 ft) below the main working level.
    (3) Subsections (1) and (2) do not apply during the initial connection of structural members where it is not practicable to provide a floor or decking.
    (4) There must be a safe means of access and egress to each main working level referred to in subsection (1).
    (5) A stairway comprised of at least framing, treads and a handrail must be provided to each floor level before construction of the next floor or deck surface is undertaken, and the treads on the stairway must not create a tripping or slipping hazard.

  • Protection from falling materials

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • (1) If falling material could endanger workers
    (a) the danger area must be barricaded or effectively guarded to prevent entry by workers, and conspicuous warning signs must be displayed on all sides and approaches, or
    (b) adequate protective canopies must be installed over the danger area, or
    (c) adequate catch platforms or nets must be provided to stop materials from falling into areas accessible to workers.
    (2) Temporary washroom facilities, offices and similar structures on a construction site must be
    (a) located outside areas where there is the potential of being hit by falling materials, or
    (b) covered by adequate protective canopies.
    (3) Protective canopies must be designed and constructed to safely support all loads that may reasonably be expected to be applied to them, but in no case less than 2.4 kPa (50 psf).

  • Chutes in place if free fall of materials or debris being removed exceeds 6 m (20 ft)

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Concrete Formwork and Falsework

  • Erection drawings and supplementary instructions for concrete formwork, falsework and reshoring must be certified by a professional engineer and available at the site during erection, use and removal of the concrete formwork, falsework and reshoring. [OHSR 20.17 (2)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • The following types of concrete formwork require erection drawings and supplementary information certified by a professional engineer:<br>(a) flyforms;(b) gang forms;(c) jump forms;(d) vertical slip forms;(e) formwork more than 4 m (13 ft) in height;(f) suspended forms for slabs, stairs and landings;(g) beam forms;(h) single sided forms over 2 m (6.5 ft) in height;(i) cantilever forms;(j) bridge deck forms;(k) shaft lining forms;(l) tunnel lining forms;(m) forms so designated by the designer of the structure.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Protruding ends of reinforcing steel which are hazardous to workers must be removed or effectively guarded. [OHSR 20.23 (1)

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • If a worker is required to be underneath the formwork during a concrete pour or placement of another significant load, the worker must be restricted from the areas where the loads are placed. [OHSR 20.23 (2)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • If loads such as bundles of reinforcing steel are being placed on the formwork, or if concrete has just been placed on the formwork, workers must be restricted from the area under those portions of the formwork until it can be assured that the formwork will withstand the load. [OHSR 20.23 (3)]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Flyform drawings available. [OHSR 20.24]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Flyform handling compliant with: <br>(1) The erection drawings and supplementary instructions for flyforms must show a step by step procedure for all phases of each cycle of assembly, flying, use, dismantling, and reuse of each flyform panel, including special procedures for non-typical floors.<br>(2) If any flyform panel is not inherently stable for all possible conditions of load, special notation on the flyform design documents must draw attention to the procedure for obtaining stability.<br>(3) The erection drawings and supplementary instructions required by subsections (1) and (2), including special procedures required for non-typical floors, must be made available to workers involved in any part of the assembly, flying, use, dismantling and reuse of each flyform panel. [OHSR 20.25]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Inspection:<br>(1) Immediately before placement of concrete or other intended loading, the employer must ensure that the concrete formwork and falsework is inspected and an engineering certificate is issued by a professional engineer, which<br>(a) indicates the specific areas inspected,<br>(b) certifies that the concrete formwork and falsework has been erected in accordance with the latest approved erection drawings and supplementary instructions, and<br>(c) certifies that specified reshoring is in place. [OHSR 20.26]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Cranes and Hoists

  • Crane or Hoist on Site

  • General Requirements Reviewed

  • Adequate crane operation communication in place

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Two-way radio or other audio or video systems acceptable to the Board must be used if distance, atmospheric conditions or other circumstances make the use of hand signals hazardous or impracticable.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • A two-way radio system used for communications between the operator of a tower crane or a self erecting tower crane and the riggers and signallers working with that operator, must operate on a frequency and at a transmitter power assigned and coordinated by the Board or by a person acceptable to the Board.<br>(2) Multi-channel radios are not permitted for use to direct crane or hoist movement.<br>(3) Only the operator of the crane and the riggers and signallers working with the operator may have the capability to transmit on the radio frequency assigned under subsection (1).

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Wireless systems
    Section 14.48(2) of the Regulation requires that audio communication systems used in a hoisting operation be designed, installed, operated, and maintained in accordance with a standard acceptable to WorkSafeBC. Generally, audio communication in hoisting operations will be conducted using two-way radios. These radio communication systems are to be
    Certified for use in Canada by Industry Canada
    Operated in conformance with all applicable licensing requirements of Industry Canada
    Designed, installed, operated, and maintained by qualified persons
    Single channel radios (as required by section 14.49(2) of the Regulation)
    Designed so that they do not have controls that allow the operator to vary the power output
    In addition, operators of such radio communication systems are to check for interference before use, and to cease use if interference is experienced. Radio communication systems designed, installed, operated, and maintained in accordance with these criteria are considered to meet a standard acceptable to WorkSafeBC.

  • Tower Crane

  • Tower crane erection, dismantling , and climbing done by a qualified person in accourdance crane manufacturer or professional engineer [OHSR 14.73.2]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Tower crane suport [OHSR 14.74]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • (1) The foundation for support of a tower crane must be certified by a professional engineer.
    (2) The design of shoring and bracing to support a tower crane must be certified by a professional engineer, and the shoring and bracing must be constructed as specified by the design.
    (3) If a tower crane is supported partially or fully by, or connected to, a building or structure, the connections to and any bracing or shoring of the building or structure necessary to support the tower crane must be certified by a professional engineer.
    (4) The bearing capacity of the supporting surface for a tower crane must be determined by a professional engineer.
    (5) The loads from a tower crane must be distributed onto its supporting surface to prevent the bearing capacity of the supporting surface being exceeded.

  • Structures kept clean [OHSR 14.78]<br>Tower crane structures must be kept clean and free of concrete and other debris that can hinder inspection and the base area must be clear of debris and the accumulation of water.

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Wind limitations [OHSR 14.92]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • (1) An anemometer must be mounted on the crown, apex or operator's cab of each tower crane.

    (2) The readout for the anemometer required by subsection (1) must be readable by the operator while at the crane controls.

    (3) Tower crane operations must stop when a load cannot be handled safely because of wind.

    (4) In the absence of the manufacturer's specifications for maximum permitted wind speed during crane operation, the maximum allowable wind speed in which a tower crane may be used is 50 km/h (30 mph), or less if a load cannot be handled safely because of wind.

    (5) A sign or other item that would increase the surface area of a crane structure exposed to wind must not be installed unless authorized by the crane manufacturer or a professional engineer.

    (6) A tower crane must not be erected, operated or dismantled when the wind speed exceeds the upper limit specified by the crane manufacturer for erection, operation or dismantling of the crane.

  • Multiple cranes on site (overlapping zone)

  • the cranes must be erected and maintained so that the lowest point of any component of the higher crane is at least 3 m (10 ft.) above the highest component of the lower crane that crosses into the overlapping operating zone

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • the boundaries of the overlapping operating zone must be marked so the boundaries are visible to the operators of all the affected cranes

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • any load suspended by the higher crane must be positioned at a location that ensures at least 3 m (10 ft.) lateral clearance between it and an operator's cab on the jib of the lower crane

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • written operating procedures must be developed and implemented to coordinate lifting tasks in the overlapping operating zone to prevent collision or interference between a component or suspended load of one crane with a component or suspended load of another crane.

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • The procedures required in subsection (3) (d) must do the following:

    (a) minimize the time each crane spends in the overlapping operating zone;

    (b) establish that the lower crane has priority for working in the overlapping operating zone;

    (c) establish that the operator of the lower crane must give temporary permission to the operator of the higher crane for each lifting sequence in the overlapping operating zone;

    (d) establish a means and protocol for communication between the crane operators when a crane operates in the overlapping zone, including a requirement for the operator of the higher crane to contact the operator of the lower crane when the higher crane is required to enter the overlapping operating zone;

    (e) establish that the lateral clearance of the load of the higher crane will be at least 3 m (10 ft.) from

    (i) the occupied cab of the lower crane, and

    (ii) the space above it;

    (f) establish that when the lower crane is being operated or when a person is on the lower crane, the higher crane will not pass a load over the lower crane unless

    (i) the activity follows work procedures acceptable to the Board and

    (ii) either

    (a) the higher crane is being used to erect, service or dismantle the lower crane, or

    (b) there is a minimum of 18 m (60 ft.) clearance between the underside of the jib of the higher crane and the highest point on the lower crane that is within the tip radius of the higher crane.

  • Manual and records adequate [OHSR 14.79]

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • The following documents respecting operation, inspection, maintenance and repair of a tower crane must be kept at the workplace where and while the crane is erected:
    (a) the portions of the manufacturer's manual or engineer's instructions required by section 14.12 (3);
    (b) all records dated from the date of structural certification under section 14.77, including those specified in section 14.75 (5);
    (c) in the case of a self erecting tower crane, all records dated from the date of the last certification of the crane.

  • Structural inspection completed before use, and at minimum annually [OHSR 14.77]

  • Recommended Improvement:

  • Compliance Bonus

  • Compliance Bonus

  • Corrective Action:

  • Person or Group Responsible:

  • Target Completion Date:

  • Date Completed:

  • Compliance Bonus

  • Compliance Bonus

Finalization

Finalization

  • Inspection Lead

  • Safety Representative

  • Site Supervisor

  • Safety Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.