Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Customer Visit
-
Was the customer's address correct?
-
How many bulk tanks are on site?
-
Are the tanks labeled correctly (product name matches invoice)?
-
Exxon Mobil DPIM Procedures: Documented loading & delivery work procedures shall be in place and implemented. Delivery procedures shall include inspections to ensure product from tank/truck compartment or (if applicable) from drums/IBCs/totes is pumped into the customer's appropriate bulk storage. All operating staff performing this activity shall be trained.
-
Are there any old labels on the tank that need to be removed?
-
Do the tanks have fill inlet and vent?
-
If multiple tanks exist, are they numbered?
-
Is the area around the tanks clean?
-
Are the tanks accessible (you don't have to move items to fill the tanks)?
-
Are there any leaks in the tank or plumbing?
-
Are there any hazards or other issues that need to be addressed to ensure a safe delivery?