Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Cardlock Inspection
-
Aboveground (AST) or Underground (UST)
- Aboveground
- Underground
-
Facility #
-
Monthly records kept properly
-
Automatic tank gauge working properly
-
Fill and fill lids properly marked
-
Spill containments are free of fuel and debris
-
Fill caps are tight and in good condition
-
Vapor caps are tight and in good condition
-
Tanks are checked for water
-
Overfill alarm is operational
-
Cathodic protection system is operating properly
-
Turbine sumps free of fuel, water, and debris
-
Turbine sump sensors at proper height & location
-
All hanging hardware in good condition
-
Dispensers labeled properly
-
Dispensers checked for leaks
-
All meters have security seals
-
Check all meters for jump and creep
-
Dispenser sumps free of fuel, water, and debris
-
All fuel, water, and debris removed from sumps
Dispensers
-
Decals posted and readable
-
Are dispensers clean?
-
All lights lit & all displays readable and operational
Nozzles
-
Trigger works properly
-
Hold open latch works properly
Hoses
-
Are any hoses cut, crimped, torn, flattened, or frayed?
-
Is the breakaway on the nozzle side of the reactor connection?
-
Is any fuel leaking from the connections?
-
Are all of the reactors working properly?
Swivels
-
All swivels move freely
Underground storage tanks
-
Spill buckets CLEAN & DRY?
-
Are the caps locked on securely? With gaskets in place?
-
Fills labeled correctly by Grade
-
Are PV valves on the vent pipes?
-
Are PV valves damaged?
Permits
-
Permits and licenses posted
-
Inspection & Maintenance eLogs current, complete, and accurate?
Overall site conditions
-
Paint
-
Is the site clean?<br>
-
Condition of concrete
-
Is asphalt in good condition?
-
How is the landscaping?