Information
-
Document No.
-
Terminal
-
Conducted on
-
Prepared by
-
Location
-
Personnel
WH Procedures Inspection
Operating Procedures
-
Repackaging log filled out and up to date
-
Bulk receipts log filled out and up to date
-
Rack meter sheets filled out and up to date
-
Tank change of service log up to date
-
Lubricant/antifreeze bulk offloading check off sheet correctly used and filled out
-
Rail car inbound/outbound inspection checklist completed
Sample Requirements
-
Samples labeled correctly and stored correctly by month and type (inbound, outbound, repackage)
-
Sample requirements posted at repackaging site
-
Using correct sample cups - minimum 4oz clear bottles
-
Viscosity of inbound truck/rail cars are checked by vis-gauge (manual or electronic)
Warehouse Inspection
-
Warehouse clean and organized
-
Pallets of products are dated with date of receipt and rotated correctly
-
Forklift inspections completed daily and records are kept electronically on the lubes drive
-
Camera checklist filled out daily and kept in electronic file on lubes drive
-
Fire extinguishers checked monthly
Outside Plant Inspection
-
Outside yard clean and organized
-
All products located in WMS bin locations
-
All bulk tanks labeled correctly
-
Loading rack clean
-
No containers of flush oil sitting around
-
No containers without labels
-
All WMS bin locations are clearly labeled
-
All bulk totes labeled correctly and labels are in good shape