Title Page
-
Site conducted
-
Document No.
-
Prepared by
-
Conducted on
The following items shall be checked at each fire extinguisher station:
-
- Fire extinguisher is in date.
- No materials stacked in front.
- Safety pin is in place and intact. Nothing else should be used in place of the pin.
- Label is clear and extinguisher type and instructions can be easily read.
- Handle is intact and not bent or broken.
- Pressure gauge is in the green and is not damaged or showing "recharge".
- Discharge hose/nozzle is in good condition.
- If applicable are Fire Blankets in place, with a sign and in date?
Room 18 reception office
-
1x 6ltr Foam
-
1x 2kg CO2
Room 27 foyer
-
1x 6ltr Foam
-
1x 2kg CO2
Room 25A
-
1x 6ltr Foam
-
1x 2kg CO2
Corridor 15
-
1x 6ltr Foam
-
1x 2kg CO2
Corridor 11
-
1x 6ltr Foam
-
1x 2kg CO2
Corridor 7 by main hall
-
1x 6ltr Foam
-
1x 2kg CO2
Main Hall
-
1x 6ltr Foam
-
1x 2kg CO2
Room 4
-
1 x 2kgCO2
Room 55 kitchen
-
1 x fire Blanket
-
1x 2kg CO2
-
2 x 6ltr wet chem powder
PE office
-
1 x 6ltr water
Old site managers office 126
-
1x 6ltr Foam
-
1x 2kg CO2
124 boiler room
-
1 x 6ltr Powder
-
1 x ltr foam
130 plant / boiler room
-
1 x 6ltr foam
first floor room 60b
-
1x 6ltr Foam<br>1x 2kg CO2
First floor corridor 66
-
1x 6ltr Foam
-
1x 2kg CO2
First floor Room 70a
-
1x 6ltr Foam
-
1x 2kg CO2
First floor Stairwell foyer room 80
-
1x 6ltr Foam
-
1x 2kg CO2
Second floor 88a
-
1x 6ltr Foam
-
1x 2kg CO2
Second floor 31
-
1x 6ltr Foam
-
1x 2kg CO2
Science block IT room store
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science block library
-
1 x 6ltr Foam
-
1 x 2kg CO2
Science block computer studies
-
1 x 2kg CO2
science block corridor library end
-
1 x 6ltr powder
-
1 x 2kg CO2
Science lab 4
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
science lab 5
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science block office
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science prep room
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science room 18
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Main corridor pastoral end
-
1 x 6ltr Foam
-
1 x 2kg CO2
Science room 5
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science room 4
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Science room 3
-
1 x 6ltr powder
-
1 x blanket
-
1 x 2kg CO2
Pastoral office
-
1 x 2kg CO2
English / Maths ground floor
-
1 x 6ltr Foam
-
1 x 2kg CO2
English / Maths ground floor room 234 elec dist cupboard
-
1 x CO2 2kg
English / Maths first floor corridor 266
-
1 x 6ltr Foam
-
1 x 2kg CO2
English / Maths first floor corridor 267
-
1 x 6ltr Foam
-
1 x 2kg CO2
137 Tech Block economics classroom
-
2 x fire blankets
-
1 x 6ltr wet chemical powder
-
1 x CO2 2kg
138 tech block workshop classroom
-
1 x 6ltr Foam
-
1 x 2kg CO2
-
1 x fire blanket
171 tech block workshop work room
-
1 x 6ltr Foam
-
1 x 2kg CO2
160 Tech block corridor
-
1 x 6ltr Foam
-
1 x 2kg CO2
134 Tech block pottery room
-
1 x 6ltr Foam
-
1 x 2kg CO2
133 Tech Block art room
-
1 x 6ltr water
Tech block plant room
-
1 x 6ltr Foam
-
1 x 2kg CO2
Darcey Bussell main entrance 186
-
1 x 6ltr Foam
-
1 x 2kg CO2
Darcey Bussell Main hall
-
1 x 6ltr Foam
-
1 x 2kg CO2
Darcey Bussell Corridor
-
1 x 6ltr Foam
-
1 x 2kg CO2