Information
-
Site Name
-
Site Address
-
Post code
-
Site reference
-
Date of Inspection
-
Inspected by
Reception Levels on Arrival:
At IDC
-
Carrier 1 - 11546
-
C/N on IDC
-
% on IDC
-
Carrier 2 - 11564
-
C/N on IDC
-
% on IDC
At Dish
-
Carrier 1 - 11546
-
Power at Dish
-
C/N at Dish
-
MER at Dish
-
Carrier 2 - 11564
-
Power at Dish
-
C/N at Dish
-
MER at Dish
Inspection
-
Description of Dish location & access, install comments
-
Photograph of dish
-
State Satellite Dish Mount Type
-
IF NPR is there sufficient ballast or if building-affixed mount were all bolts fully tightened?
-
Describe remedial works carried out or further action required.
-
Was the dish aligned correctly?
-
Describe remedial works carried out or further action required.
-
State LNB type:
-
Was the LNB correctly skewed?
-
Describe remedial works carried out or further action required.
-
Was the O ring present?
-
Describe remedial works carried out or further action required.
-
Was a C120 WR75 transition installed (not required for C120 LNB's)?
-
Describe remedial works carried out or further action required.
-
Was the LNB/cable connection correctly waterproofed?
-
Describe remedial works carried out or further action required.
-
State satellite cable type:
-
Was the cable correctly tied at dish and along cable route?
-
Describe remedial works carried out or further action required.
-
Describe connector types and quality of connection:
Reception Levels on Completion:
At IDC
-
Carrier 1 - 11546
-
C/N on IDC
-
% on IDC
-
Carrier 2 - 11564
-
C/N on IDC
-
% on IDC
At Dish
-
Carrier 1 - 11546
-
Power at Dish
-
C/N at Dish
-
MER at Dish
-
Carrier 2 - 11564
-
Power at Dish
-
C/N at Dish
-
MER at Dish
General comments / Further actions required
-
Any additional comments
-
Any additional photos
-
Engineer 1