Information

  • Document No.

  • Audit Title

  • Conducted on

  • Pre-Start Meeting Conducted By:

  • Signature

  • Client / Site

  • Location
  • Nearest Hospital

  • Scope or Works for Shift:

  • Personnel

  • First Aid Officers

High Risk Tasks (mark applicable for shift):

  • Excavation/Trenching

  • Hot Work

  • Working at Heights

  • Confined Spaces

  • Working near Overhead Services

  • Electrical Work

  • Working near Traffic

  • Working in the vicinity of Mobile Plant

  • Operation of Powered Plant or Equipment

  • Working in Isolation

  • Hazardous Manual Handling

  • Asbestos Removal

  • Working within Rail Corridor

  • Handling/Transporting Hazardous Substances and Dangerous Goods

  • Isolation Testing and Tagging

  • Working near or over Water

  • Crane Operation and Rigging

  • Rail Crossings Utilised

  • Other

Requirements

  • Are controls on place to ensure personnel working in the vicinity of mobile plant and public vehicles are safe? ie. Restricted Access, Barriers, Exclusion Zones, Traffic Control, (Rail) Track Protection, etc... REMEMBER THE MINIMUM EXCLUSION ZONES AROUND MOBILE PLANT

  • Is reversing on site kept to a minimum and has a designated spotter been assigned?

  • Is there adequate protection around Open Pitts / Trenches, Excavation etc?

  • Have all services been identified (Overhead and Underground)? For the identification of Underground services, has a DIAL BEFORE YOU DIG been undertaken?

  • Have appropriate spoil (excess material) dumpsites been identified?

  • For all high risk tasks identified above, has a SWMS been developed and a permit completed (where applicable)?

  • Do all personnel understand the requirement of SWMS in use and signed off?

  • Is all equipment fit for purpose and in good working condition? (incl. completion of Pre-Start Checks) IF NOT, HAS IT BEEN REMOVED, ISOLATED / TAGGED OUT?

  • Are all plant operators or trades inside licensed, competent and fit for work? Have you verified documents that are required on the Authority to Work Permit (for contractors)?

  • Are all personnel including contractors wearing the appropriate PPE for the job?

  • Are Emergency procedures in place and equipment available.

  • Are any adverse weather conditions predicted for the shift? ie. High temperatures / humidity, storms, flood warnings, etc.. (also consider Total Fire Ban Days / Fire Danger Periods)

  • RAIL SPECIFIC Has the Rail Safe working Pre-work brief been presented to the personnel on site? Are all controls checked

  • Worksite Diagram (Zone of Understanding)

Hazards / Non-Conformances

  • Item 1

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 2

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 3

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 4

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 5

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 6

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 7

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 8

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 9

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Item 10

  • Initial Rating

  • Controls / Actions Apply Hierarchy of Controls 1.Elimination, 2. Substitution, 3. Engineering, 4. Administrative, 5. PPE

  • Residual Rating

  • Signature

  • Other Items to be discussed at the Pre-Start Meeting

  • List Relevant SWMS in use for Shift

Pre-Start Meeting Attendees

  • By signing this risk assessment, your are confirming that you are fit for duty and not adversely affected by fatigue, drugs or alcohol.

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

  • Name

  • Signature

Use of this Form (Zero Harm STAR Start Guidance)

  • This for is used as a general HAZARD IDENTIFIACTION AND RISK ASSESSEMENT tool for any worksite and is used in conjunction with Safe a Work Method Statements (SWMS). It I'd also ICRC to record the pre-start meeting.
    It must be used:
    • Before starting work each day on a work site.
    • Following any change to a worksite which may affect health, safety or the environment.
    • For Mobile work sites, this form is to be completed for the first job/activity, and any subsequent risks are to be considered, documented, reviewed and controlled for all other jobs during the shift.

Step 1: Site Walk Around

  • • Review the site prior to the start of work. Enter work site details and complete the checklist on Page 1 .
    • Note any hazards identified and any controls needed from Page 1 checklist on Page 2.
    • The WORKSITE DIAGRAM can be used as a short-term works Vehicle Movement Plan (VMP) and/or to communicate fencing, barriers, temporary warning signs, roads, rail tracks etc.. It may also be used to define the exclusion zones, evacuation points, spotters, vehicle turning bays, etc..

Step 2: Risk Assessment and Controls

  • • Assess hazards identified an determine appropriate controls. Use the Risk Assessment Matrix below when assessing hazards.
    • For high-risk tasks, list the SWMS in use for the shift.
    • Ensure that site personnel are consulted when formulating controls for hazards identified.
    • List any other items to be discussed in Page 2.
    • Apply the Hierarchy of Controls.

Step 3: Pre-Start Meeting / Communication

  • • Conduct a Pre-Start Meeting and communicate the hazards and. Introns to site personnel prior to starting work. Also discuss any other items listed on Page 2.
    • Record details of who was briefed/attended the Pre-Start meeting on Page 2.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.