Title Page
-
Document Number:
-
Approved Date:
-
Prepared by
-
Suburb Name:
-
Cluster:
-
Block:
-
Contractor:
CAC Quality Control Check List:
-
All Snags attended too and Rectified:
-
DIT submitted to Zoom and Pased (DIT's to be performed by Contractor)
-
Fibre has been floated successfully: (To confirm the integrity of the duct)
-
Date and Time Stamped photos with Co-Ordinates per cluster, block, route has been provided:
-
EHS Documents submitted with all incidents, toolbox talks, accidents, investigations:
-
DCP Test results, Must be date and time stamped with coordinates:
-
Civil As-Builds:
Snag List:
Service Affecting Snags:
-
Trench Depth and placement correct as per plan:
-
Trench straigh and reinstatement level with NGL
-
Correct duct size and configuration installed:
-
Ducts Installed straight and free of kinks and bends:
-
Trench Tape installed:
-
Manhole and AP placement correct as per plan:
-
Reinstatement around Manhole level with NGL:
-
Drainage sump installed under all manholes and AB's:
-
Duct entries and cutbacks done correctly:
-
Concrete encasement done correctly where applicable:
-
DCP test results done to specification requirements:
-
DIT's done to specification requirements:
Non-Service Affecting snags:
-
Re-instatements complete to original condition or better:
-
Foaming of Manholes and AB:
-
End caps on Installed duct:
-
Labelling of Manholes and AB's:
-
Tar Reinstatement on road cuts completed in line with specification requirements:
-
PVC conduit, saddles and inspections eye's - "Lollipops" installed level and secure:
-
Housekeeping:
-
Civil AsBuild complete and accurate:
-
EHS Documents submitted:
Other Snags:
-
Were there other Snags Identified?
-
List all other Snags Identified:
Bill of Quantities:
Manholes/Ducts/Fibre Joints:
-
Manhole - 600R (Pcs)
-
Access Box - 320 T (Pcs)
-
1 Way 8/5 Subduct (Meter)
-
1 Way 14/10 Subduct (Meter)
-
2 Way 8/5 Subduct (Meter)
-
2 Way 14/10 Subduct (Meter)
-
4 Way 14/10 Subduct (Meter)
-
32mm Subduct (Meter)
-
110mm Sleeves (Meter)
-
50mm Coil Sleeves (Meter)
-
Dust Caps 8/5mm (Pcs)
-
Dust Caps 14/10mm (Pcs)
-
Trench Tape (Meter)
Final Civil Acceptance:
-
All Documents and reults to be provided prior to final CAC being signed off. Please Note should any of the above information remain outstanding from the contractor, the CAC will not be signed.
-
It is hereby confirmed that the work performed is completed under the client specifications in accordance with Zoom Fibre Policies and procedures and is deemed correct.
-
Zoom Fibre Representative Sign-off:
-
Contractor Representative Sign-off: