  • Cluster ID

  • ISR Conducted on

  • ISR Completed by

  • Location

Location

  • Is the residents address correct?

  • Is the property single or multi storey?

  • Is there an existing lead in to the property?

  • What is the surface type?

  • Are parked vehicles in the vicinity of the work area going to be an issue?

  • Is there any restricted access such as schools?

  • Where is the nearest network access in regards to the residence?

OVERHEAD

OH

  • Is the feed OH into the residence?

  • Are there any D Poles on the planned route?

  • Are the poles within test date?

  • Is tree cutting required on the planned route?

  • Are there any EL poles on route?

  • Are we working within close proximity of OH HV?

  • Is the pole the CBT is situated on congested?

  • Is there a polebend and is it clear?

  • Is pole clearance required? (i.e ivy or dense foliage)

  • Are the spans between poles on the planned route within the CP08 guidelines. (i.e height off the ground + maximum span lengths)?

  • Is the span between the property and the pole within CP08 guidelines (i.e height off the ground + maximum span length)?

UNDERGROUND

UG

  • Does the chamber require gullysucking?

  • Does the chamber require desilting?

  • Is there a Toby box present?

  • Is there a duct between the Toby box and the existing PIA network?

  • Is there sufficient space for the installation of the CBT? i.e MOBRA/Kit1A

  • Is there spare capacity in the bore?

  • Are all lids accessible and liftable?

  • Is site clearance required? (No parking cones or pre warning to local residents?)

TRAFFIC MANAGEMENT

  • Is TM required?

  • What type of TM?

  • What is the speed limit on the road?

  • What is the road width?

  • Do you have sufficient sight lines in both road directions?

CIVILS

Civils

  • Does the job require civils?

  • What type of civils work is required?

  • Does the job require a standoff chamber due to congestion?

  • Is track required between pole and chamber?

  • Is civils required from boundary of premises to existing network point?

  • Is a new pole required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.