Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

1st floor checklist/inspection.

  • What is the discrepancy in top of blockwork?

  • Is the joisting/precast floor slabs wrapped with air-tight membrane where they penetrate internal leaf of cavity wall?

  • Do the joists/pre-cast match the span on approved/engineer design, incl. correct bearing, centres between each member, etc.

  • If joists, have the ends been treated with peservative?

  • If applicable, has fire segregation been achieved between floor levels by agreed method, e.g fire cavity bag, closing cavity, etc. and if so, has a step DPC been installed above fire bag level?

  • Have all straps been installed in blockwork and notched into joists i.e where joist runs parrell to block wall

  • Have double joists been install under any structural studs or in areas where joist work is hung from another joist i.e at stair openings, etc.

  • Has the correct width and length for stair opening been included i.e enough headroom and width for stairs (IF IN DOUBT ON MIN. DIMENSIONS ASK!!!)

  • Has allowable drill area for services in joists been marked on example joist in each room?

  • Is there a clear plan for temp. support of joisting/precast prior to loading with blockwork? Incl. temp. sheeting and void protection for stairwell?

  • Is grouting complete to pre-cast slabs if applicable?

  • Please add clear photos of overall 1st floor install.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.