Information
-
HAZARDOUS MANUAL TASKS RISK ASSESSMENT
-
Task/Assessment Title
-
HMT Number
-
Conducted on
Part A - ASSESSMENT SUMMARY
-
Date Risk Assessment Date Completed
-
Task/Job Description/Name (Assessment Title):
-
HMT No.
-
Location
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
Department Manager/Coordinator:
-
Select date
-
WHS Representative (HSR)
-
Select date
Part C - RISK RATING & ACTION PLAN
-
Can this task/job or process be eliminated entirely?
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Hazardous Manual Tasks Risk Assessment Checklist and detail measures taken or that need to be taken to address the hazards
-
Basic Task Step and Hazard Description
-
Code Reference/s from Checklist (e.g. B3 or E3)
-
Existing or Current Controls in Place
-
Identified/Potential Hazard/s (expanded explanation from checklist)
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by