Title Page
-
Conducted on
-
Prepared by
-
Location
Existing building information
-
Address of the trade counter
-
take photos of the external elevations
-
What's the fabric of the building
-
Takes photos of the trade counter area with any existing heating ie over door heaters etc
-
What is the current heating scheme in the trade counter ie Warm air, radiant tube , Air conditioning
-
Take photos of the current heating and position in the trade counter.
-
Has the trade counter got multiple warehouse and do these have a heating scheme ?
Proposed Heating upgrades
-
What is the flow rate for the gas meter
-
Take photos of all the utility meters
-
What is the proposal for the heating upgrade
-
Is there any electrical work required for the upgrade.
-
Take photos of the fuse board and position in the store.
-
Takes photos of the proposed position of any new equipment.
-
Are there any access issues for the new equipment installation
-
Would the site benefit from stress mats
-
What are the trade counter delivery schedules
-
Will the proposed works need to be completed overnight
-
Will a security guard be required for the proposed works
-
Take a photo of the Asbestos register front page and analysis sheet.
-
Is there any other works planned for the site in the next 3 months ie ESMP
-
Full management team names & Area manager for the site.
-
Time and date for the scope
-
Store management on site whilst the scope/survey was being completed.
-
Who completed the scope/survey