Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Transfer Lines (Red Jacket / Suction Diffuser) Sunrise Meeting

  • Meeting time

  • All functions are represented

  • Open Action Items are review and updated

  • Data Elements are added and discussed

  • Misses are actioned and added to Basecamp

  • Notes:

R.A.I.L. (Rolling Action Item List) Review

  • Actions are current

  • Each action has an owner and a date

  • Notes:

Pipedrive Check

  • Pipedrive is updated with all open orders

  • Delinquency filter is applied and past due items discussed

  • Actions for past-dues are assigned in Basecamp with dates

  • Notes:

Supervisor Standard Work Check

  • Standard Work Card is in his/her possession

  • All checks conducted as specified

  • Gemba Walk Key Element of Supervisor's Checks

  • notes:

Hour by Hour Performance

  • Expected and Actual output is posted through the current hour

  • Root Causes for over / under achievement documented and understood

  • Notes:

Material Kitting

  • Minimum of two days of Production is staged in the Visual square

  • Kits are complete to include impellers and motors

  • There is only one kit to a square ( no multiples / batching)

  • QA can provide evidence that current day's kits have been inspected

  • Notes:

QA Checks

  • QA can provide evidence of in-process inspections

  • Yellow cards are completed properly in sync with the current operation

  • Work instructions are posted and followed

  • Notes:

Rework Queue

  • Validate the number in queue on the floor with the number in Pipedrive

  • Causes for each rework unit have been identified

  • There is a specific action item owner for each rework unit

  • Notes:

Tested Units

  • Testing queue contains only units for current days production

  • Evidence can be shown that sampling adheres to GBT 2828

  • Number of RJ units tested

  • Number of RJ units failed at test

  • Number of SD units tested

  • Number of SD units failed at test

  • Causes for each failure are identified

  • Untested but suspect products are quarantined as appropriate

  • Notes:

Total Delinquency number

  • Number of Delinquent Red Jackets

  • Number of Delinquent Suction Diffusers

Safety Checks

  • Safety checklist has for the current day been validated

  • Safety actions are up-to-date

  • Lifting procedures

  • Material Handling / Movement

  • Overhead craine usage

  • Slip, Trip and fall hazards to include wet surfaces

  • Sharp Object review

  • Ergonomics

  • Notes:

Five S Status

  • Five S Scorecard posted and up-to-date

  • Only required tools, materials, and WIP is in the Cell

  • Only the required paperwork is in the cell

  • Location for all pallets, containers and bins are marked and identified

  • All pallets, containers, bins, and WIP are in the correct locations

  • Tools and fixtures are all within easy reach of the operator

  • Walls, floors, equipment and walkways are clean and clear.

  • daily cleaning schedule with accountable person posted

  • Notes:

MBF Checks

  • Turbine GDP MBF's updated, current and showing effectiveness

  • MBF Counter-measures for the Production Group are current and are proving effective

  • Notes:

  • Signature of the GM

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.