Title Page
-
Client / Site: Barwon Water - Black Rock WRP Inlet Works Upgrade 400 Black Rock Cable ID No:
-
Conducted on
DETAILS
-
Inspection Area:
-
Reference: BW Technical Specification Rev 0 Clause: 38.3 Cables 38.4 Cable Installation - General 38.5 Conductor Termination
-
Document No. CA-CS-005 ITP No:
CABLE DETAILS
-
Origin:
-
Destination:
-
Size and Type:
-
Cables for VSD drives motors shall be shielded by integral earthed screen
-
There shall be no more 1 conductor per screw or tunnel type terminal
-
Stainless steel cable ID's fitted to cables below gland plate
-
Shrouds have been fitted over glands and secured in place (where required)
-
Power cables shall have stranded conductors having a minimum cross sectional area of 2.5 mm2
-
EMC Cable glands are correct type / size and have been tightened
-
Wiring numbers clearly identified by ferrules
-
Notes/Comments
TESTING
-
Core colour:
- Red Core
- White Core
- Blue Core
- Black Core
- Earth
-
Continuity Test - OHMS Confirmed
-
Insulation Resistance MEGOHM Reading
-
Wire No Clearly Identified<br>
-
Core Colour:
- Red Core
- White Core
- Blue Core
- Black Core
- Earth
-
Continuity Test - OHMS Confirmed
-
Insulation Resistance MEGOHM Reading
-
Visual Inspection undertaken
-
Wire No Clearly Identified
-
Core Colour:
- Red Core
- White Core
- Blue Core
- Black Core
- Earth
-
Continuity Test - OHMS Confirmed
-
Insulation Resistance MEGOHM Reading
-
Visual Inspection undertaken
-
Wire No Clearly Identified
-
Core Colour:
- Red Core
- White Core
- Blue Core
- Black Core
- Earth
-
Continuity Test - OHMS Confirmed
-
Insulation Resistance MEGOHM Reading
-
Visual Inspection undertaken
-
Wire No Clearly Identified
-
Core Colour:
- Red Core
- White Core
- Blue Core
- Black Core
- Earth
-
Continuity Test - OHMS Confirmed
-
Insulation Resistance MEGOHM Reading
-
Connected to Earth both ends
APPROVALS
-
Cable Installation is
-
Actions to be taken:
-
Entered on Punch List
-
Punch list Reference Number:
-
Item No:
-
Meter Make & Model:
-
Meter Serial Number:
-
Calibration Date
-
Person Completing the Checklist
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature:
-
Agfab Approval By:
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature: