Information

  • Client / Site: Barwon Water - Black Rock WRP Inlet Works Upgrade 400 Black Rock Connewarre

  • Conducted on

GENERAL

  • Client Site:

    Barwon Water - Black Rock WRP Inlet Works Upgrade
    400 Black Rock Connewarre

  • Agfab project No: 22884

  • Name of persons controlling the works:

INITIAL INSPECTION

  • Daily pre-start conducted and signed by all workers

  • Attendance register current (all persons signed on)

  • START Cards completed

  • Site supervisor on site and off the tools

  • First aider(s) on site

  • ITP in place for current works and signed up to date.

  • Amenities adequate, clean and maintained

  • Any indication of persons on site not fit for work (including fatigue compliance)

  • Site PPE requirements being met

  • Public safety controls in place (eg fencing, barriers, signage)

  • Site clean and tidy (general housekeeping)

  • Traffic management controls in place as per TMP

  • Hazardous materials storage area (bunded & labelled)

SWMS

  • SWMS in place for current works

  • All persons signed onto SWMS

  • Reviewed in the last 7 days

  • SWMS applicable to the task being performed

  • Work being performed in accordance with SWMS

  • Any other PPE required (site/task specific)

  • Competent for task being undertaken (check tickets)

ENVIRONMENTAL MANAGEMENT

  • Erosion/Sediment control in place, adequate and maintained

  • Waste disposed of in labelled bins. Recycling segregated.

  • Concrete wash out in designated area. Bunded and lined.

  • Sensitive vegetation barricaded and signage in place

  • Soil stockpiles >10m from watercourses

  • Refuelling >50m from watercourses

  • Dust suppression adequate

  • Noise/vibration/odour controls adequate

EXCAVATION AND TRENCHING

  • Statutory notification submitted

  • Excavation and Trenching permit in place (Duration as specified)

  • Daily trench inspection documented

  • Trench benched, battered or shored adequately

  • Safe means of entry and exit

  • Barrier and signage to protect workers and public

  • Spoil or materials not placed within 1m of excavation edge

MOBILE PLANT

  • Operator competency/license available

  • Plant Register current and PRA available

  • Daily plant prestart check completed

  • Operable flashing light, reverse alarm and fire extinguisher

  • Designated pedestrian routes separate from plant movement

WORKING AT HEIGHT

  • Ladders secure and only used for access/egress (unless platform ladder)

  • Scaffolds tagged (monthly)

  • Live edges barricaded (Flagging/mesh min 2m out)

  • Elevated Work Platform (EWP) in good condition, harness in use and on level and stable ground

  • Penetrations protected to prevent fall of people & materials. Covers (incl grid mesh) securely fastened in place.

  • Protection of workers below/falling objects

  • Work at heights controls implemented

CONFINED SPACE

  • CSE permit in place and controls implemented

  • Entry/Exit log maintained (See permit)

  • Gas monitoring in place

  • Observer/standby persons present

  • PPE and signage inplace

  • Rescue Plan in place

ELECTRICAL

  • Electrical tools and leads tested and tagged (3 monthly)

  • Electrical leads elevated and insulated from metal objects

  • Electrical supply panels secure (no unauthorised access)

  • RCDs fitted and tested Monthly (check site sheds)

  • Extension leads single length only

LIFTING AND RIGGING

  • Lifting gear register current (3 monthly inspection completed)

  • Lift study completed for lifts (Where required)

  • Crane Safe green sticker (Current 12 month)

  • Plant has SWL/WLL clearly marked

  • Rigging gear in good condition, SWL/WLL marked

  • Rigger/dogman used to control the lifting loads

  • Lift areas delineated and clear of persons

WELDING AND HOT WORKS

  • Hot Work permit in place and controls implemented

  • Flash back arresters, flash protection & weld curtains

  • Earthing in place, leads tagged and in good condition

  • Oxy or other gas bottles secured and stored separately

GENERAL COMMENTS:

  • Add additional photos if required:

  • Add a drawing to assist observations and actions required:

  • Name of the person completing the checklist:

  • Signature of the person completing the checklist:

  • Name of the Worksite Manager:

  • Signature of the Worksite Manager:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.