Title Page
-
Store Name
-
Store No
-
Prepared by
-
Is this Project a
-
Conducted on
Existing A/C Equipment
-
Existing AC information
Existing A/C Equipment
-
Description of Area Feeding (Salesfloor Front. Mid, Rear / Prep) etc
-
What Refrigerant the existing unit on?
-
Is the existing Indoor Unit a
-
General Outdoor Unit Pictures showing Location / ID
-
General Indoor Unit Picture showing Location / ID
-
Pictures Indoor A/C unit Void / area details
-
Details / Size of Voids etc
-
Room Size (Length / Width / Height)
-
Heat Gain (Brief Description of Heat gain if needed)
-
Existing equipment details
-
Units to be
-
Existing Suction & Liquid Sizes
-
Approx Distance from Condenser to Indoor unit
-
Is a collar Needed
-
Collar SIze
-
Any making good to be completed? Ceiling grid / tiles etc (Maybe ex Cassette is a double size, New is a standard?)<br>(Take pictures of area in question)
-
Take Pictures of area in Question
-
Brief Description of works
-
Where is the new Location?
-
Approx distance from old location to new location
-
Existing Suction & Liquid Sizes
-
Is A collar Needed
-
Collar SIze
-
Any making good to be completed? Ceiling grid / tiles etc (Maybe ex Cassette is a double size, New is a standard?)<br>(Take pictures of area in question)
-
Take Pictures of area in Question
-
Brief Description of works
-
Why is the unit being temp dropped (New ceiling grid / height etc)?
-
General Notes for this section
New A/C Equipment
-
Is New A/C Equipment needed? (over and above existing equipment being replaced)
-
Advise Area the new A/C is required for (Salesfloor / Prep / dispensary) etc
-
Pictures of where new plant will go
-
Details of new plant area (Roof Ground Level / Dimensions etc)
-
What type of indoor unit is required
-
Pictures of Area (Ceiling / General pictures)
-
Ceiling Void Pictures
-
Ceiling Void Details / Size etc
-
Room Size (Length / Width / Height)
-
Heat Gain (in Metres) Brief description of heat gain if needed.
-
Notes for this section
Delivery & Positioning of Plant
-
Do we need to replace / remove or add to existing Plant?
-
Pictures of how to get unit into position / or remove from site. Note road Name of applicable.
-
What lifting equipment do we need to complete works?
-
Advise Height / Complexity / How far etc
-
General Notes for this section
Services
-
General Pictures of existing services
-
Any concerns / Notes / Info to assist with service replacement / Modification
-
Any concerns/ Notes / info to assist with services modification
Electrical Info
-
General Mains board Pictures showing location etc
-
Ex A/C Breaker Information
-
Breaker Information (Rating and phase)
Key Dates
-
Is this Project a :
-
Client PM
-
Shopfitter and representative
-
Contact and email
-
Start date
-
First Fix
-
New ceiling Ceiling Grid Install
-
Second Fix / Cassette install and commission
-
Maintenance works should be completed ASAP (Within 10 working Days)
-
Handover
-
Client PM
-
Shopfitter and representative
-
Contact and email
-
Store Closure
-
Removal of Existing / Temp Drop Ex Cassette etc
-
First Fix
-
New ceiling Ceiling Grid Install
-
Second Fix / Cassette install and commission
-
Maintenance works should be completed ASAP (Within 10 working Days)
-
Handover
-
Maintenance works should be completed ASAP (Within 10 working Days)
-
R22 Replacement works should revolve around Refits & Maintenance works (No time line)