Title Page

  • Conducted on

  • Prepared by

  • Location
  • Aldi personnel to de-merchandise cabinets prior arranged cleaning

  • Add media

  • All clean materials to be used in accordance with COSHH and correct PPE to be warn

  • Remove all shelving, back panels and base plates, to expose evaporator.

  • Install drainage plug into drain outlets, wash down all cabinet components.

  • Evaporator Coil

  • Air Plenum

  • Rear panels

  • Supply and return air grills

  • Honeycombs

  • Evaporator fan assembly

  • Remove all water and debris using wet & dry vacuum

  • Check evaporator clear

  • Check probe installation

  • Leak check cabinet

  • Pipe connections

  • Isolation valves

  • Schraeder points

  • Expansion devise

Re-assemble cabinet

  • Re-start cabinet

  • Check correct operation

  • Check operation of drainage (Pumped)

  • Check operation of gravity drainage

  • Store: Signature agreeing above requirements are complete

  • Epta representative signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.