Title Page

  • Conducted on

  • Prepared by

  • Location
  • Are you signed in at the store?

  • Have you been inducted on where fire exits and assembly points are?

AIR CONDITIONING

  • Check operation of system in heating mode

  • Check operation of system in Cooling mode

  • Check condition and operation of remote control unit

  • Remove fascia grille and filter on the internal unit and clean

  • Remove fan blade on the internal unit and clean

  • Clean internal coil

  • Apply drain cleaning chemical to drip pan

  • Clean and check operation of internal drain lift pump

  • Clean and check external drain pump or gravity drain

  • Check air flow differential across coil (cooling 8-10, heating 10-15 differential)

  • Clean condenser (OFN where appropriate)

  • F-Gas leak Check

  • Clean condenser (OFN where appropriate)

  • Clean Housing (Outdoor Unit)

  • Check & tighten electrical connections

  • REFRIGERATION DISPLAY CABINETS BOTH INTEGRAL & REMOTE / COLDROOMS

  • Check on condition and report any defects on the worksheet

  • Check all electrical cables, fitting & circuit protectors

  • F-Gas leak check- condensing unit, evaporator & associated pipework

  • Check defrost heaters, defrost settings & thermostat

  • Check operation of electronic controller

  • Check condition of all case panels and doors

  • Check and clean condensate drain pan if fitted condensate pump test operation

  • Clean condenser (OFN where appropriate)

  • Clean evaporator coil, drain pan and condensate tray

  • Check door gaskets

  • Check lighting

  • ICE MACHINES

  • Ice machine maintenance and cleaning tasks are to be carried out in accordance with manufacturers illustrations and recommendations

  • Leak check all accessible valves and pipework

  • Check water filter and replacement date, Change if due. To be replaced annually

  • DOOR CURTAINS

  • Isolate unit at mains and local electrical supplies

  • Check fan motor mounts and tighten if necessary

  • Check all electrical terminals and condition of wiring

  • Refit unit housing and run unit on test

  • Check current draw on heaters and fan motor

  • Ensure all covers have been fitted correctly and cleaned

  • Ensure unit is switched on and remote control is working

  • VENTILATION

  • Does the site have extract system

  • Is it operational

  • Engineer's Signature

  • Store Signature agreeing the above requirements are completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.