Information

  • Audit Title

  • Conducted on

  • Client / Site

  • Prepared by

  • Location

Jobsite Information

  • OSHA and DOL posters displayed?

  • OSHA 300 Logs displayed from February 1 thru April 30 ?

  • Emergency phone numbers displayed?

  • Emergency action plan in place and all employees know it?

  • First aid available and up to date?

Housekeeping

  • Passageways and walkways clear?

  • Are all types of materials stock piled and neat?

  • Is the jobsite clear of slips, trips, and falls?

  • Jobsite clean and trash in containers?

  • Toilet facilities adequate and clean?

  • Sanitary supply of drinking water and cups?

Fire Protection

  • Flammables in safety cans with flash arresters and labeled?<br>

  • Fire extinguishers immediately available and inspection tag current?

  • Are Flammable or No Smoking signs posted at storage or fueling location?

Welding and Cutting

  • Gauges, valves, torches and lines in good condition?

  • Cylinders upright, secured and protected from damage?

  • Fire extinguisher near welding or cutting area?

  • Stored oxygen and acetylene capped, separated 20ft.?

  • Adequate ventilation provided?

Jobsite Safety

  • Is there a confined space on site we will be working in?

  • Floor openings covered or guard railed and marked?

  • Vertical rebar capped or covered?

  • Hollow pan treads filled with solid material?

  • Proper guard rails, toe boards at open sided floors, openings, and shafts?

  • Harness and lanyards used when guard rails are absent?

  • Anchor points capable of supporting 5000 lbs.?

  • Subcontractors wearing hard hats, safety glasses 100% of the time?

  • Rate this job site for safety.

  • Select from range

Electrical

  • GFCI's in use or positive ground been tested?

  • Temporary distribution boxes covered and marked?

  • Lockout procedures being used?

  • Are extension cords and power tools being inspected daily for cuts and ground pins?

  • If equipment is live, are the proper safeguards and PPE in place for arc flash?

  • Is temporary lighting protected?

Tools

  • All guards in place and used?

  • Lock out tag out procedures in place and being used for defective tools?

  • Proper PPE being used?

  • Cut resistant gloves being worn?

  • Handles in place and free of splinters, fractures and breaks?

  • Proper ladder being used for the task?

  • Three points of contact when ascending and descending ladders?

  • Step ladder fully open and braces locked in place?

Equipment

  • Seat belts in use if equipped?

  • All equipment inspected and documented daily?

  • All operators are certified and have cards on site including crane operators, aerial work platforms, all types of forklifts etc.?

  • Do cranes have current inspections and paperwork?

  • Operators wearing hard hats?

  • Horns and backup alarms functioning?

  • Swing radius of the crane has been cleared and guarded?

  • Certified signalman has been designated for the lift?

Trenching and Excavation

  • Trench side shored, layered back or boxed

  • Ladder in trench every 25 ft.?

  • Materials stock piled at least 2ft. from the edge?

  • Proper ventilation in the pipe?

  • Barricades and warning signs in place?

  • Designated competent person?

  • Utilities contacted and marked before any excavation begins?

  • Tested air quality in pits, shafts, funnels or other confined space before entering?

Site conclusion

  • Did you observe any unsafe acts or practices on this site?

Signatures

  • By on site representative

  • By auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.