Title Page

  • Document No.

  • ARCA AUDIT

  • Client / Site

  • Site Address
  • Conducted on

  • Prepared by

THE FOLLOWING SECTION MUST BE COMPLETED AND CONSIDERED SATISFACTORY BEFORE CONTINUING FURTHER WITH THIS AUDIT.

  • Is there a valid (I.e. In date) ASB5 Notification Form on site for the works to be audited?

  • Is there (or will there be) asbestos removal work or cleaning in progress within the enclosure during the audit?

  • Is there provision to observe work practices within the enclosure by means of CCTV and / or viewing panel(s)?

  • Is there a site specific Plan of Work available on site for the works?

  • Is there a copy of the Company Standard Procedures / Generic Procedures available on site?

  • Is the Decontamination Unit fully functional in terms of power, ventilation and the provision of hot and cold running water for showering?

DO NOT PROCEED WITH THE AUDIT UNLESS EACH RESPONSE ABOVE IS AFFIRMATIVE. SHOULD ANYTHING ABOVE BE AMISS THAT CAN BE RECTIFIED IMMEDIATELY, THEN CONTINUE WITH THE AUDIT ONCE RECTIFIED. SHOULD ANYTHING ABOVE BE AMISS THAT CANNOT BE RECTIFIED IMMEDIATELY, THEN INFORM THE SUPERVISOR THAT THE AUDIT CANNOT CONTINUE.

ASB5 Notification Form

  • Are details of any other licence holders recorded in section 3 of the ASB5?

  • What form of asbestos containing material is being worked upon? (Section 4 of ASB5)

  • What is the approximate extent of the works stated in section 5 of the ASB5?

  • What is the maximum number of employees per shift stated in section 5 of the ASB5?

  • How many operatives (including the supervisor) are on site?

Site Documentation

  • Is the Contract Supervisor the same person as specified in the plan of work?

  • Does the plan of work detail to whom upon? (Section 4 of ASB5)

  • Does the plan of work detail when the work is to be carried out? (Including start/finish times and weekend variations)

  • Does the plan of work detail the analytical company providing stage 4 clearance?

  • Does the plan of work detail who the analytical company is contracted to?

  • Does the plan of detail the type of asbestos involved? (I.e. Amosite, Chrysotile, Crocidilite)

  • Does the plan of work detail the condition of the asbestos containing material to be removed? (E.g good, fair or poor)

  • Does the plan plan of work (or standard procedures) detail who is authorised to amend the plan of work?

  • Does the plan of work (or standard procedures) detail the construction method for enclosures and airlocks?

  • Does the plan of work (or standard procedures) detail the arrangements for smoke testing and witnessing?

  • Does the plan of work (or standard procedures) detail decontamination entry and exit procedures?

  • Does the plan of work (or standard procedures) detail the type of respirators used?

  • Does the plan of work detail the asbestos removal technique to be used?

  • Does the plan of work detail the air monitoring arrangements for the duration of the works?

  • Are welfare facilities detailed in the plan of work and are they available for use as described?

  • Is the scope of works adequately described on the plan of work, and does it match the details recorded on the ASB5?

  • Is there a site specific risk assessment available for inspection, for hazards other than asbestos? (Hot work, work at heights, use of hand tools, confined spaces, electricity, manual handling etc.)

  • Is there a set of COSHH assessments on site? (Smoke fluid, foam, spray adhesives etc.) NB. Material Safety Data Sheets on their own are insufficient.

  • Is there a copy of the contractor's current valid licence available for inspection?

  • Is there documented evidence on site confirming current insurance cover for both employers' liability and public liability? E.g. Insurance schedule

  • Are daily site and plant inspections records (including DCU, enclosure, airlocks, NPU's & vacuum cleaners) available for inspection and up to date?

  • Does the NPU inspection record include manometer / pressure gauge readings for each NPU in use (including DCU)?

  • Has the smoke test record for the enclosure been completed and do the witness details match those stated in the plan of work?

Site Supervisor and / or Operative(s)

  • Current Medical Certificate?

  • Current Training Certificate?

  • Training Provider?

  • Face Fit Test Certificate for RPE in use?

  • Examination Record for RPE in use? (Daily if in enclosure, current monthly, if not)

  • Adequate response when questioned regarding emergency procedures? (If not in enclosure)

  • Supervisor / Operative(s) clean shaven?

  • If out of enclosure, or seen before entry

  • Additional comments

  • Are all copies of certificates above individually authenticated by, or under the direction of senior management with a statement confirming their validity?

Site Organisation

  • Does the sketch plan included with the plan of work match the site set up and include the positions of the NPU, airlock, bag lock (if applicable), viewing panels /CCTV and DCU as a minimum?

  • Do viewing panels and / or CCTV sow all areas so far as is reasonably practicable?

  • Is each viewing panel (where applicable) at least 600 x 300 mm?

  • Are there adequate warning signs which comply with the safety signs and signals regulations? (Including the black hand prohibition symbol)

  • Is there a suitably stocked first aid kit available on site?

Plant on site / Certification

  • Are there at least 2 H-type vacuum cleaners on site?

  • Are current DOP test certificates (or copies) available and relevant to each vacuum on site?

  • Does the number and capacity of the NPUs in use correspond with that stated in the plan of work?

  • Are current DOP test certificates (or copies) available and relevant to each NPU on site?

  • Is there a current DOP test certificate (or copy) available on site for the NPU within the dirty end of the DCU?

Enclosure / Airlock

  • Is the enclosure in sound condition and constructed so as o prevent the spread of asbestos?

  • Is the airlock free from visible asbestos debris?

  • Is a bucket and sponge (or similar) available for decontamination of respirator?

  • Are the airlock openings either oval or rectangular in shape?

  • Do the flaps cover the airlock adequately?

  • Are all of the airlock flaps weighted?

  • Is each stage of the airlock at least 1m x 1m x2m (height)?

  • Does the inner stage of the airlock have a viewing panel at least 600 x 300mm?

Observed Work Practices

  • Is the pre-filter (or roving head) the only part of the NPU that is exposed to the working area? (I.e. NPU sheeted out if inside the enclosure)

  • Does the RPE (including filter) being used match that stated in the plan of work?

  • Are all components of the full face RPE uniquely identifiable? (E.g. Mask, blower, and battery identified/marked/tagged with name or item/serial number)

  • Are colours of coveralls as stated in the plan of work or standard procedures?

  • Are all items of necessary PPE being worn properly? (e.g. Overall hood over head straps , overalls not tucked in to working footwear etc.)

  • Does the dust suppressant method being used match that stated in the plan of work?

  • Is the dust suppression method suitable for the type of work or material? (if needle injection machine being used, please state manufacturer)

  • Does the asbestos removal technique being used match that stated in the plan of work?

  • Has the waste been appropriately bagged? (e.g. Immediately and single bagged if still in the enclosure)

Hygiene Facility

  • Is the unit positioned in relation to the work area as stated in the plan of works?

  • If the unit is not directly connected to the enclosure, would it have been reasonably practicable to do so?

  • Is the transit route as short as possible and away from occupied areas?

  • Is the DCU fully functional/in working order? (Heating, Lighting, Water Filter, Drains etc.)

  • Are the internal doors and external door to the dirty end self-closing?

  • Are there an adequate number of shower heads for operatives? (I.e. at least 1 for every 4 operatives)

  • Is there a nail brush provided in the shower area?

  • Is the unit in good condition and clean so far as reasonably practicable?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.