Title Page
-
Conducted on
-
Prepared by
-
Location
AUDIT PARTICULARS
-
Site Number and Name :
-
Conducted on :
-
P0 Date :
-
Prepared by :
-
Location :
-
J Brand Engineers Onsite :
-
Sainsbury's Engineers Onsite :
Site Readiness
-
Has the hardware been located and checked for completeness?
-
Please describe problems with locating kit. Also describe all damage list all missing kit :
-
Is the Router installed and active?
-
Please provide a picture of front of router showing patching and connection status LEDs:
-
Router Serial Number :
-
Is there space in the correct cabinet, and is it marked up with the location where the servers and NAS are to be installed?
-
Is a printout of the patch mapping attached to the inside of the cabinet where the servers, NAS and Router are patched?
-
Please provide a picture of the patching plan :
-
Is a cabinet tidy also being carried out?
Installation
-
Are the Servers and NAS installed in the designated cabinet, in the marked location?
-
Please provide pictures of the kit in location :
-
Please give details why not :
-
Please provide pictures of kit in new/alternative location :
-
Are the Servers and NAS plugged into UPS-protected power?
-
Please provide pictures showing UPS PDU and power cables to NAS and Servers :
-
Please provide pictures of the PDU they are powered from :
-
Has the Sainsbury's engineer patched in the Servers, NAS and Router, and so all network ports show active lights?
-
Please provide a picture of the back of devices showing activity lights if possible, if not provide a picture of the switch front :
-
NAS Drive Serial Number :
-
Primary Server Serial Number :
-
Secondary Server Serial Number :
DOA / Site Issues
-
Was any hardware received DOA?
-
Please list all DOA kit
-
Are all issues resolved?
-
Please detail issues reported below :
Sign Off
-
Site left clean and tidy?
-
Please give reasons for leaving untidy :
-
Comments
-
Sainsbury's Engineer name and signature :
-
J Brand Engineer Name and Signature :
-
Completion Date & Time :