Title Page
-
Conducted on
-
Prepared by
-
Location
INSTALLATION DETAILS
-
Installation Engineer(s):
-
Installation Date:
-
Start Time:
-
Finish Time:
-
Store Name:
-
Store Number:
HARDWARE LIST - Please select all hardware used
-
Has the bespoke Ethernet Cables -296238629 + RJ45 STANDPOLE IPP3xx been supplied?
-
Quantity used :
-
Quantity left and removed from site :
-
Has any spare PEDs -IPP350 been supplied?
-
Quantity used :
-
Quantity left and removed from site :
-
Has any spare power supplies - UK 230V AC/ 8V DC 2A LF been provided?
-
Quantity used :
-
Quantity left and removed from site :
INSTALLATION DETAIL
-
Please add as many tills as there are in the store
TILL #
-
PED Serial #
-
Confirm PED RAM 21.05
-
Confirm moulded RJ45 installed & PED configured to TCP/IP
-
Confirm post configuration, CAT cable connected and PED has downloaded files
-
Confirm PED shows ‘Welcome’ screen N.B contactless PED’s only show ‘Welcome’ text
-
Test each till to PED screen, confirm PED responds to ‘present card’
CHECKS AND SIGN OFF
-
Confirm Number of PEDs swapped out
-
Please detail any additional RJ45 cable runs and patch leads used:
-
Has a store colleague checked each till and signed off?
-
Name of the Store Colleague/Manager :
-
Store Colleague/Manager signature:
-
Engineer signature:
-
PLEASE NOW EXPORT THE REPORT AND SHARE WITH THE PROJECT MANAGERS OFFICE IMMEDIATELY