Title Page
-
Address:
-
Project Code:
-
Contractor:
-
Consultant:
-
On-site contact:
-
Conducted on
-
Prepared by
Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)
-
Sewer connection points constructed to regulation height / depth
-
Anchor support / thrust block for bend installed
-
Sewer connection points constructed complete with marker tape to surface
-
Sewer connection points constructed complete to surface
-
Construction / installation of branch sewer (from main to property boundary) conforms with approved drawings (connection offsets)
-
Bedding material suitable / fit for purpose?
-
If branch sewer line (from main to property boundary) is of significant length (e.g. >10m), request CCTV survey to check for correct grade. Branch sewer line must drain properly from IS / IO to sewer main - no flat spots or inverts.<br>If CCTV required, click on the menu to the right and create a Follow Up action.
-
Comments:
-
I confirm that this audit is:<br>Choose from Compliant or Non-compliant needs follow up.<br>You can 'Complete' this audit and 'Save' even if you are waiting for more information. You can return to this report and 'Edit' and 'Save' later.
-
Name / Signature