Title Page
-
Address:
-
Project code:
-
Contractor:
-
Consultant:
-
On-site contact:
-
Conducted on
-
Prepared by
Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)
-
OH&S requirements satisfied including:
-
Road traffic control
-
Barricades / Shaft covers
-
Trenching
-
Protective clothing
-
Other
-
Pipe and fittings transported, stored and handled appropriately and in acceptable condition
-
Valve and fittings material / coating conform to standard
-
Pipe material / class conforms to design drawings / specifications
-
Pipe laying conforms to standards with respect to:
-
Jointing
-
Bedding
-
Backfill
-
Trench support
-
Compaction
-
Other
-
Manholes checked for step irons (no step irons except by prior written agreement)
-
Depth of cover conform to design drawings
-
Other e.g. thrust blocks, air valves etc.
-
Comments:
-
I confirm that this audit is
-
Name / Signature