Ensure that water assets are constructed using appropriate safety measures (traffic control, trench shielding etc.), pipes are correct material and stored correctly etc.
Scan this QR code to use this paper checklist on your smartphone or tablet or
visit
https://safetyculture.com/
Title Page
Address:
Project Code:
Contractor:
Consultant:
On-site contact:
Conducted on
Prepared by
Audit report.
Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)
OH&S requirements satisfied including:
Road traffic control
Barricades
Trenching
Protective clothing
Other
Pipe and fittings transported, stored and handled appropriately and in acceptable condition
Valve and fittings material / coating conform to standard
Pipe material / class conforms to design drawings / specifications
Pipe laying conforms to standards with respect to:
Jointing
Bedding
Backfill
Trench support
Compaction
Other
Thrust blocks installed to standard
Depth of cover conform to design drawings
Other
Comments:
I confirm that this audit is
Name / Signature
Kris Hunter
Construction audit form - water reticulation
Ensure that water assets are constructed using appropriate safety measures (traffic control, trench shielding etc.), pipes are correct material and stored correctly etc.
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions.
The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction.
You should independently determine whether the template is suitable for your circumstances.