Title Page
-
Address:
-
Project Code:
-
Contractor:
-
Consultant:
-
On-site contact:
-
Conducted on
-
Prepared by
Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)
-
Inspected for:
-
Trenches levelled and top soil applied
-
No evidence of subsidence
-
Installed as per approved drawing design:
-
Sluice valves
-
Fire plugs
-
Indicators / markers
-
Other
-
Surface fittings remain level and flush to finished surface levels
-
Area clean and surplus material removed
-
Final reinstatement quality is satisfactory / complies with contract requirements:
-
Jointing
-
Bedding
-
Backfill
-
Compaction
-
Other
-
Condition of washout assemblies remain satisfactory
-
Construction conforms with final as-constructed plans
-
Mains have been flushed and are free of air and colour. If chlorine residual tested, please record results here.
-
All valves have been turned on and are operational?
-
Water main extension ready for connection / tappings?
-
Comments:
-
I confirm that this audit is
-
Name / Signature