Title Page

  • Address:

  • Project Code:

  • Contractor:

  • Consultant:

  • On-site contact:

  • Conducted on

  • Prepared by

Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)

  • Inspected for:

  • Trenches levelled and top soil applied

  • No evidence of subsidence

  • Installed as per approved drawing design:

  • Sluice valves

  • Fire plugs

  • Indicators / markers

  • Other

  • Surface fittings remain level and flush to finished surface levels

  • Area clean and surplus material removed

  • Final reinstatement quality is satisfactory / complies with contract requirements:

  • Jointing

  • Bedding

  • Backfill

  • Compaction

  • Other

  • Condition of washout assemblies remain satisfactory

  • Construction conforms with final as-constructed plans

  • Mains have been flushed and are free of air and colour. If chlorine residual tested, please record results here.

  • All valves have been turned on and are operational?

  • Water main extension ready for connection / tappings?

  • Comments:

  • I confirm that this audit is

  • Name / Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.