Title Page
-
Address:
-
Project Code:
-
Contractor:
-
Consultant:
-
On-site contact:
-
Conducted on
-
Prepared by
Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)
-
Is the asset a manhole?
-
Inspected for:
-
Trench subsidence
-
Correct manhole(s) finish level (e.g. level above ground)?
-
Check for infiltration in manhole(s) - go to terminal manhole and check for infiltration; if evidence of infiltration found then proceed upstream to identify source.
-
Other
-
Is the asset a maintenance shaft?
-
Inspected for:
-
Trench subsidence
-
Correct maintenance shaft(s) finish level (e.g. level above ground)?
-
Check for infiltration in maintenance shaft(s) - go to terminal manhole and check for infiltration; if evidence of infiltration found then proceed upstream to identify source.
-
Other
-
Other e.g. thrust blocks, air valves etc.
-
Is the asset a water main and / or fittings?
-
Inspected for:
-
Trench subsidence
-
Valve cover level and condition
-
Fireplug level and condition
-
Check for marker posts and ensure correct markings and distances
-
Check air valves covers and pits
-
Check washouts
-
Check scour points / valves
-
Other
-
Comments:
-
I confirm that this audit is (select Compliant, Non-compliant needs follow up or Waiting for CCTV survey).<br>You can 'Save' this audit report without signing or marking as complete and come back later and 'Edit' the report and 'Save' the changes.
-
Name / Signature