Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Step -1-

  • Carefully read all notes on the Doka Drawings.

  • Once the concrete has reached 3,000 psf. you may prepare to jump the platform.

  • Inspect the platform for damaged wood or unsafe conditions.

  • Remove any loose item or secure them firmly.

Step -2-

  • Remove ties.

  • Strike the formwork (strip the formwork)

  • Make sure all stripping corners are fully engaged.

  • Make sure formwork is secured.

Step -3-

  • Attach the lifting chains or rigging

  • No ones is permitted to "ride" on the platform.

Step -4-

  • Reposition the unit (platform and formwork).

  • Once the platform is repositioned, before the rigging is cut loose, make sure the pawls are positioned correctly into position.

  • Release rigging.

  • Place your photos here.

  • Baker Concrete, Competent Person signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.