Information

  • BCCW-Doka MF240 Climbing Checklist.

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Step -1-

  • Carefully read all notes on the Doka drawing.

  • Remove ties and disconnect formwork cornes.

  • Disconnect newly cast anchor from formwork.

  • Release traveling unit locking wedges.

Step -2-

  • Retract the traveling unit with formwork attached and lock wedge.

  • Prepare the next suspension point (Cone Bolt B7)

  • Detach the wind straps.

Step -3-

  • Move traveling unit close to center of gravity.

  • Attach crane to vertical profile lifting points.

  • Undo the safety pins from horizontal profile.

  • All workers vacate platform.

  • Hoist the formwork until with the crane and hook into prepared suspension points.

  • Replace the safety pins in horizontal profile.

  • Secure all handrails.

Step - 4 -

  • Attach the wind straps.

  • Release the traveling unit locking wedges.

  • Roll formwork element to wall (desired concrete pouring position) and lock wedges.

  • Close formwork corners and add ties.

Step - 5-

  • Verify Doka material is installed per Doka Drawings and user Information.

  • Place your photos here.

  • Baker Concrete. Competent Person Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.