Title Page
-
Site conducted
-
Conducted on
-
Inspector
-
Engineer Name
-
Location
Resident Inspection Authorisation & COVID 19 Questions
-
Does the engineer have the correct workwear?
-
Can the Operative clearly outline the procedure to prevent the spread of COVID?
-
Is the Operative aware of the COVID symptoms?
-
Does the Operative have all COVID PPE available as supplied by the Company (Sanitizer, wipes, disposable gloves, face visor, masks)?
-
Select weather conditions at time of inspection..
- Clear Sky
- Cloudy
- Raining
- Windy
- Hazy
- Snow/Hail
- Sunny
Site Safety and Customer Service
-
Is the works vehicle parked safely?
-
Is the works vehicle tidy?
-
Does the Operative have access to current RAMS? (LearnUpon or hard copy)
-
Evidence Site Safety Set-Up: Has the engineer carried out site set-up using a safety A-frame & keeping walkways clear
-
Is the engineer using the correct floor protection?
-
Has the customer been suitably advised on the repair process and potential hazards associated, including the safe zone, work zone locations and reporting potential hazards to the British Gas Incident reporting line?
-
Has the engineer followed safe working practice - Risk assessment/Controls/Asbestos awareness
Electrical Equipment Checklist
-
Earth Loop Impedance Meter / Capture serial number & calibration date
-
Insulation Resistance & Continuity / Capture serial number & calibration date
-
RCD Response Time Test Meter / Capture serial number & calibration date
-
2-Pole Indicator Condition
-
Personal RCD
-
Any / All Lock Off Equipment & Devices Condition
Electrical - Safe Isolation Process
-
REQUIRED - Engineer MUST Demonstrate Safe Electrical Isolation Process
-
Can the engineer identify the earthing system of the property?
-
Can the engineer make correct use of the non-contact Volt Detector (Volt Stick x2 available)?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
-
Can the engineer conduct a visual inspection and Identify the risks? (Plug top, fuse rating, supply cable, socket outlet, extension lead, double adapters etc)
-
Can the engineer perform an Earth Loop Impedance Test (ELI)?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Can the engineer perform an RCD Response Time Test?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Can the engineer perform an Earth Continuity Test?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Can the engineer perform an Insulation Resistance Test?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Has the engineer conducted a polarity check on the socket of the appliance?
-
Can the engineer make use of the 2-Pole Indicator to prove dead?
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Can the engineer make use of lock-off equipment?
PPE & Work Equipment
-
Picture of full PPE [Empty Contents and Check Equipment Stock Levels]
-
PPE bag available on-site?
-
Has the engineer created a safe working zone using Health and safety A-frame?
-
Does the engineer have the correct PPE /Work Equipment in order to undertake the work safely? [Including COVID PPE]
-
Does the engineer have a fully stocked, in date First Aid Kit including eyewash?
-
PPE / Equipment Checklist
- Test Socket Adaptor
- FFP3 Face Masks
- Socket & See [Earth Loop Tester]
- Voltage Detector / Volt Pen
- Surface Protection Mats
- RCD
- PPE Storage Kit Bag
- Electrical Lock Off Equipment
- Cable Ties
- Safety Glasses
- Bump Cap
- First Aid Kit Including Eyewash
- Dustsheets / Floor Protection
- Cut 3 Gloves
- Knee pads
- Non-slip Overshoe
- Hi-Viz
- Safety Footwear
- Socket and See (RCD Tester)
- Kevlar Sleeves
- PPE / Equipment Storage Bag
- Anti Slip Mats
- Electrical Hanging Safety Notice
-
Any equipment damaged or missing - arrange replacement
-
Work being carried out in a safe manner using appropriate, serviceable PPE?
-
Operatives Gloves & Work Clothing
-
Is all hand tools / field equipment free from damage?<br>(if at risk, remove from use immediately and replace)
-
Personal RCD available
-
Does the engineer have X1 1KG Powder Fire Extinguisher Available? [Fully Pressurised and Maintained]
-
Is safety footwear in good condition and of the correct type?
-
Are staff aware of the correct PPE for the tasks they are trained to perform?
-
Access Equipment / Lifting Equipment in good condition and free from any defects? (Check feet, platforms **where applicable)
-
Oven Table
-
Cooker table
-
Hop-Up
-
Does the engineer have correct paperwork [Unsafe situation & other warning labels]
Sign Off
-
Auditor Feedback (Please detail your observations and any coaching provided to engineer)
-
Auditor Sign
-
Operative Sign