Title Page
-
Site conducted
-
Date of inspection
-
Inspector
-
Previous Engineer
-
Location
Site Safety and Customer Service
-
Potential hazards identified - including the safe zone, work zone locations and reporting potential hazards. Photograph any hazards
-
Please photograph the working area, appliance and surrounding areas
Electrical - Safe Isolation Process
-
Please photograph the British Gas Electrical customer checklist left with the customer from the previous engineer
-
Please identify and record the earthing system of the property.
-
Non-contact Volt Detector check (Prove - Test - Prove)
-
A visual inspection conducted and Identify the risks. (Plug top, fuse rating, supply cable, socket outlet, extension lead, double adapters etc)
-
Please perform an Earth Loop Impedance Test (ELI)
-
If ELI test fails please perform an RCD Response Time Test
-
Perform an Earth Continuity Test
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
If the plug top is accessible perform an Insulation Resistance Test.
-
Inspector - refer to attached Electrical Safety Training Presentation & Provide Training
-
Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided
-
Perform a polarity check on the socket of the appliance if the socket is accessible
-
Please photograph the working area, appliance and surrounding areas at the end of the visit
Feedback
-
Please detail any issues identified
-
Please detail any corrective required on previous engineer
Sign Off
-
Auditor Feedback
-
Auditor Sign
-
Operative Sign