Information
-
Audit Title
-
Document No.
-
Conducted on
-
Client
-
Prepared by
-
Address
Existing System
Existing Boiler Information
-
Cylinder Stat on Existing System
- Yes
- No
-
Thermostat Exisiting System
- Yes
- No
-
Two Port Valve on Hot Water
- Yes
- No
-
Two Port Valve on Heating
- Yes
- No
-
3 Port Valve on Existing System
- Yes
- No
-
Econergy Responsible For Disposal of Old Boiler
- Yes
- No
-
Programmer on Exesting System
- Yes
- No
-
Econergy Responsible For Making Good Old Flue Hole
- Yes
- No
-
Photo of Both Sides of Flue
-
Photo of the Fuse Board With Door Open
-
Photo of Values, Pump and Programmer
New System
New Boiler Information
-
Boiler Type
- Chip
- Pellet
-
Underground Pipe Required
- Yes
- No
-
Soft Dig Meterage
-
Hard Dig Meterage
-
Total Pipeline Length
-
Length of Cable Required from Fuse Board to Boiler
-
Length of Cable Required from Valves to New Boiler
-
Length of Data Cable from Client Router to Boiler
-
Number of Pumped Circuits from New Boiler
-
Fuel Store Type
-
Fuel Store Location
-
New Boiler Location
-
Trench Route
-
Drawing of Existing Buildings, New Boiler, Fuel Store Location and Any Required Trenching
Site Services
Site Services
-
Skip Required
-
Adequate Welfare Facilities
- Yes
- No
-
Equipment Unloading Supplied by the Client
- Yes
- No
-
Client to Sign That the Above is Correct
Additional Information
-
NOTES
-
Add signature