Information

  • Audit Title

  • Document No.

  • Conducted on

  • Client

  • Prepared by

  • Address

Existing System

Existing Boiler Information

  • Cylinder Stat on Existing System

  • Thermostat Exisiting System

  • Two Port Valve on Hot Water

  • Two Port Valve on Heating

  • 3 Port Valve on Existing System

  • Econergy Responsible For Disposal of Old Boiler

  • Programmer on Exesting System

  • Econergy Responsible For Making Good Old Flue Hole

  • Photo of Both Sides of Flue

  • Photo of the Fuse Board With Door Open

  • Photo of Values, Pump and Programmer

New System

New Boiler Information

  • Boiler Type

  • Underground Pipe Required

  • Soft Dig Meterage

  • Hard Dig Meterage

  • Total Pipeline Length

  • Length of Cable Required from Fuse Board to Boiler

  • Length of Cable Required from Valves to New Boiler

  • Length of Data Cable from Client Router to Boiler

  • Number of Pumped Circuits from New Boiler

  • Fuel Store Type

  • Fuel Store Location

  • New Boiler Location

  • Trench Route

  • Drawing of Existing Buildings, New Boiler, Fuel Store Location and Any Required Trenching

Site Services

Site Services

  • Skip Required

  • Adequate Welfare Facilities

  • Equipment Unloading Supplied by the Client

  • Client to Sign That the Above is Correct

Additional Information

  • NOTES

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.