Blocking

  • Conducted on

  • Prepared by

  • Location

  • Operators

  • Reference SOPs TB010 - TB018 - TB029

Blocking

  • Correct components selected and placed in jig correctly

  • 100% Glue coverage on all joints

  • All timber joints stapled correctly ( 3 staples across the grain, triangular where possible)

Runnering

  • Have the runner blocks been attached correctly (100% Glue coverage, 3 staples across the grain, triangular where possible)

  • Runners positioned correctly, ensuring the runner stops are used

  • Correct size screw used, 30mm screw in the 1st hole under wheel.

  • Correct size screw used, 20mm 2nd from the end (135cm) and 8th hole (120/150/180cm)

  • Shade card aligned correctly, staple distance maximum 150mm apart

Audit Complete

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.