Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Boulder Wall Daily Checks

  • Team Leader - Sign-offs (Confirm checks have been done by team)

Maintenance

  • Monitoring Board has been checked and relevant information noted

  • Any maintenance known about, or discovered is acted on and time managed

  • The required areas are isolated off

Emergencies

  • Sign off First Aid Kit

  • First Aid Fully Stocked?

  • Everyone has Walkie Talkie/ Radio?

  • Everyone is on the same channel, Correct Volume and with Ear phones?

Bookings

  • Booking Calendar checked, and all are informed

Other

  • Check Weekly and monthly scheduled checks

  • General Checks - Sign-offs (Confirmed by the individual who did the checks)

Environment

  • All Lights Work

  • Room Temperature is suitable

Visual and safety

  • All Signage is present and visible

  • All Signage is clean, undamaged, and correctly mounted

  • Nothing is stuck to walls or equipment

Emergencies

  • Fire Exit is accessible

  • Fire Safety Equipment (used by zone) is Present and Accessible

  • First aid is mounted on wall clearly

Hydration

  • Water dispenser is full, and stocked up

General layout

  • Bean Bags are correctly placed, and Wooden mount sits away from Glass

  • Safety Barrier Ropes are Functional and Closed

  • Participants Equipments boxes are empty and presentable

  • Refreshing Wipes are stocked enough for the day

  • Cleaning requirements have been reported to the cleaners point of contact

  • The Main Store Front Windows Are clean on both sides or reported

  • The anti-bacterial spray bottle is full for the day

  • Equipment Checks - Sign-Offs (Confirmed by the individual who did the check)

Climbing Holds

  • The Climbing holds are free of hazardous damage?

  • Climbing holds are tightly connected and don't spin?

  • The Climbing holds route is correctly tagged

Descend Rope

  • The Rope is in good working order

  • The Rope is connected safely.

  • The Eyelets are connected tightly

Line Markings

  • The Line markers are clean, clear and correctly placed

Mats

  • Connection fabrics safely cover gaps between maps

  • The Boulder Wall safety mats and equipment are clear of hazards

Personal Protective Equipment (PPE)

  • All Helmets are suitable for operation

  • All Climbing shoes are suitable for Operation

  • All helmets are wiped down.

  • Activity Leader

  • Activity Specialist

  • All checks must be ticked and signed by the trained instructor who carried out that specific check. A zone specifically trained Team Leader, or if not present, a Zone Specifically trained Duty Manager must sign off the sheet as a whole, and the Team Leader specific checks also. If any of the following fail, and the risk from this is not managed/ controlled, or deemed acceptable risk, the site is not suitable for opening. All issues must be reported to the Duty Manager. Site Layout sheets are available for visual diagrams of area specific issues. All daily checks must be completed before opening.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.