Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General Checks - Sign Off (Confirmed by the Individual who did the checklist)

Environment

  • All Lights working?

  • Is room temperature suitable?

Visual and Safety

  • All Signage is present and visible?

  • All Signage cleaned, undamaged and correctly mounted?

  • Nothing is stuck on walls or equipment?

Emergencies

  • Is Fire Exit Accessible?

  • Fire Safety Equipment (used by Zone) is present and accessible?

  • First aid box is mounted on the wall clearly and is fully stocked?

General Layout

  • Bean Bags are correctly placed out of participants way?

  • Are refreshing wipes stocked and enough for the day?

  • Cleaning requirements have been reported to the cleaners point of contact?

  • All surrounding glass panels have been cleaned and mats have been vacuumed?

  • No additional papers, stickers or trash is stuck to the mats?

Boulder Walls - Sign off (Confirmed by the individual who did the checks)

Boulder Wall A

  • Connection fabrics safely cover the gaps between the mats?

  • Are safety mats clear of any hazards?

  • Climbing Holds are tightly connected, doesn't spin and are free of any hazardous damage?

  • Are Routes correctly tagged?

  • Boulder Wall A is Structurally sound, clean and presentable?

  • Performed test climb?

Boulder Wall B

  • Connection fabrics safely cover the gaps between the mats?

  • Are safety mats clear of any hazards?

  • Climbing Holds are tightly connected, doesn't spin and are free of any hazardous damage?

  • Are Routes correctly tagged?

  • Boulder Wall B is Structurally sound, clean and presentable?

  • Performed test climb?

Boulder Wall Main

  • Connection fabrics safely cover the gaps between the mats?

  • Are safety mats clear of any hazards?

  • Climbing Holds are tightly connected, doesn't spin and are free of any hazardous damage?

  • Are Routes correctly tagged?

  • Boulder Wall Main is Structurally sound, clean and presentable?

  • Performed test climb?

Area Specific Equipment

  • Chalk Bags have been replenished for the day and are connected to the bags?

  • Activity Leader

  • Activity Specialist

  • All checks must be ticked and signed by the trained instructor who carried out that specific check. A zone specifically trained Team Leader, or if not present, a Zone Specifically trained Duty Manager must sign off the sheet as a whole, and the Team Leader specific checks also. If any of the following fail, and the risk from this is not managed/ controlled, or deemed acceptable risk, the site is not suitable for opening. All issues must be reported to the Duty Manager. Site Layout sheets are available for visual diagrams of area specific issues. All daily checks must be completed before opening.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.