Title Page
-
site
-
Conducted on
-
Prepared by
-
Location
-
Level
-
Area
-
Drawing no.
-
Installer name
-
Ceiling series
-
Ceiling types
-
Competence check
1.0 Pre-Commencement Checks
-
Date
-
Pre-commencement checked by
-
Has specification been finalised? Have all the relevant RFI's been answered?
-
Have Benchmark area's been agreed with Principal contractor, in situ for each ceiling type ?
-
Is area clear, accessible & Unobstructed? Are exclusion zones agreed?
-
Have correct materials and plant been loaded out at the work area?
-
Are materials (plasterboard, metal sections, accessories, plaster) stored in dry conditions?
-
Are primers and ready-mixed materials protected from freezing conditions?
-
Has setting out been agreed, and are gridlines and Datums established?
-
Has the builders works information been co-ordinated?
-
Has M & E sequencing been, co ordinated & Void closure handover received?
-
Have BPC received the current, approved layout drawings?
-
Have BPC received, full, co-ordinated & dated trade handovers?
2.0 First Fix Ceilings
-
Date
-
Work installed by
-
Has the perimeter MF6A channel section been fixed to the perimeter at a maximum 600mm centres
-
Have MF12 soffit cleats complete with FEA1 angle sections, been fixed to the structure at a maximum of 1200mm centres, with approved fixing suitable for the background and load ? ( hangers can also be sniped and folded in on itself and over lapped instead of of MF12 soffit cleat)?
-
Are the MF7 primary support channels resting on the flange of the MF6A, and have they been fixed to each hanger using BG wafer head 13mm jack-point screws (two per hanger)?
-
Have any joining of MF7 primary channels been done by position the channels back to back, with a minimum of a 150mm over lap, fixed together using two BG wafer head 13mm Jack-point screws?
-
Have the MF5 ceiling sections been fixed at right angles to the underside of the MF7 support channels at a maximum of 450mm centres, using BG wafer head-Jack-point screws through the flanges?
-
Are MF5 ceiling sections, fully engaged into the MF6A perimeter channels?
-
Have any joining of MF5 ceiling sections primary channels, been done by overlapping the sections by 150mm, and fixed together using two BG wafer head Jack-point screws through each flange?
-
Ensure that the intersection of any MF5 sections, does not clash with any MF7 channel Joints?
-
Ensure the ceiling grid is true and level, and does not clash with any services & access panels, ?
-
has access panels been correctly support (check specification) ?
Fist Fix Completion Handover Issued
-
Date
-
Checked by (BPC Manager/Supervisor)
3.0 Pre-Second Fix & Services Check
-
Have we received the service containment handover documents?
-
Have the correct materials and plant been loaded out at the work area?
-
Has insulation installation been completed. ? (if required).
-
If required, are any timber noggins/pattresses installed ( for surface mounted fixtures).
Pre-Second Fix Handover Issued
-
Date
-
Checked by (BPC Manager/Supervisor)
4.0 Second Fix Ceiling Installation (Closing Up)
-
Date
-
Work installed by
-
Has the first layer of board been fixed, with the long edges of the board at right angles to the MF5 ceiling section framing, using BG drywall screws, of the appropriate length?
-
Are the board ends lightly butted together, with ends joints staggered?
-
Are screw centres at a maximum of 230mm apart and 150mm at board ends?
-
Are screw fixings no closer than 10mm from bound board edges, and 13mm from curt board edges?
-
For double, and multilayer linings, are the board joint staggered by half a board across the width, and to the next MF5 ceiling section, along the length?
-
Have the correct length screws been used on double and multiple layer linings?
-
Have all service holes been cut, if required?
-
Is the ceiling board lining, true and level?
-
Have the GRG install correctly with 10 mm gap in between?
-
Second fix completion handover issued?
Second Fix Completion Handover Issued
-
Date
-
Checked by (BPC Manager/Supervisor)
5.0 Beads & Edge/Revel Trims
-
Date
-
Work installed by
-
Have the beads or trims been checked against the specification, are they correct?
-
Are any shadow gaps at a constant width?
-
Are all trims plumb, level, and straight?
-
Are all mitres neat and tight fitting, with no lipping?
-
Are all screw heads sufficiently recessed into leg of trim?
6.0 Tape & Jointing Finish
-
Date
-
Work installed by
-
Is the area clear, accessible & unobstructed? are exclusion zones agreed?
-
Are the site lighting levels adequate foe a satisfactory inspection?
-
Has a Benchmark area been agreed, in-situ, and approved by main contractor?
-
Are site conditions suitable for the application of finishes (humidity, temperature, etc.)?
-
Has the paper tape been correctly applied and bedded in?
-
Have any excess fillers been removed to leave surfaces mostly flat?
-
Has sufficient drying time (min. 24 hours) given between coats?
-
Are all screw heads covered?
-
Has light sanding been completed, leaving no edges?
-
Have any minor imperfections been filled?
-
Does the final jointed coat, feather out beyond the first application?
-
Has the final sanding been completed to leave smooth continuous surface?
-
If required, has drywall primer or sealer coat been applied, prior to hand over to following trades, for decoration?
-
Does the finish meet the standard agreed at benchmark?
-
Is protection required to salient angles?
-
have surrounding surfaces been cleaned i.e. mullion/glass & trims. ?
7.0 Completion and Handover
-
Date
-
Handover completed by (BPC Manage/Supervisor)
-
Has the work been adequately protected on completion of installation?
-
Have works been snagged and recorded correctly?
-
Have all snags been cleared and signed off both BPC and the client?
-
Have works been handed over to the client and accepted?
-
Checked by Overbury Manager