SAS System 200 - Metal Ceiling (QWC-009-F)
-
site
-
Prepared by
-
Location
-
Level
-
Area
-
Drawing No.
-
Installer Name
-
Competence Check
-
Ceiling Series
-
Ceiling Type
1.0 Pre-Commencement Checks
-
Date
-
Pre commencement check By:
-
Has the specification been finalised? Have all relevant RFI's been answered?
-
It is the area clear, accessible & unobstructed? Are exclusion zones aggread?
-
Have the correct materials been loaded out at the work area?
-
Are all materials (EMAC channels and hangers, C Profiles, side check angle sections, noggins profiles, bracketry, ceiling panels, insulation pads) stored in dry conditions?
-
Has the setting out been agreed, and are gridlines and datums established?
-
Has the M&E sequences been co-ordinated & void handover received?
-
Have BPC issued the current, approved layout drawings?
-
Have BPC received a full, co-ordinated & data trade handovers?
2.0 First Fix Ceilings - Hangers and EMAC channels
-
Date
-
Works installed by
-
Reconfirm that fixing pull-out results are satisfactory?
-
Have the hangers been installed at the correct centres(i.e. 1200mm centres to suit the EMAC primary support channel and a maximum of 1200mm centres along the channel length). Note: Hangers must be installed in accordance with the SAS grid layout drawing.
-
Have the EMAC primary channels been installed at the correct centres and in accordance with the SAS grid layout drawings? Are noggins fixed to primary channels with the correct SAS wall fixings angel bracket, using 2 no. 13mm tek screws to each side?
-
Have any joints/splices to the EMAC channel runs been staggered?
First Fix Completion Handover Issued
-
Date
-
Checked by (BPC Manager/Supervisor)
3.0 Second Fix Ceilings - C Profiles and Noggins
-
Date
-
Work Installed by
-
Have the C profiles been suspended from the EMAC channels, using the correct hook-over or twist suspension brackets? Suspension bracket layout must follow SAS grid layout drawing.
-
Have all C profiles been fixed together, and to end, using 2 no. M8 x 16mm nuts & bolts, in pre-drilling holes?
-
Have 250mm & 150mm C profiles been fixed to 200mm C profiles, in their correct locations, using 2 no. M8 x 16mm nuts & bolts, in pre-drilling holes, follow SAS C profile layout?
-
Have side cheek angle sections been cut squarely and fixed to sides of C profiles using 13mm tek screws, at the correct centres?
-
Have gaskets been fixed to side cheek angle sections, at the correct height shown on SAS detail drawing?
-
Have perimeter C profiles been fixed with a 15mm gap to the façade?
-
Has the setting out for the C profiles been checked and confirmed against the SAS grid layout drawing?
Second Fix Completion Handover Issued
-
Date
-
Checked by (BPC Manager/Supervisor)
4.0 Close Up - Panel Insulation
-
Date
-
Work Installer
-
Have panel noggins been fitted at the correct setting out to the C profiles?
-
Have panel brackets B1 & B2 been fitted at the correct setting out to the C profiles?
-
Have panels been fitted to the correct bay using torsion springs, in accordance with the SAS panel bay drawings?
-
Have torsion springs been checked to ensure all are inserted correctly?
-
Have cut outs been formed for the monorail support posts and collar trim inserted correctly?
-
If required, has the ceiling been braced?
-
Have all the ceiling panels been installed to the benchmark standard?
-
Have safety cables been fitted to each individual panel, and fixed back securely to the supporting framework?
Completion & Handover
-
Date
-
Handover complete by (BPC Manager/Supervisor)
-
Have works been snagged and recorded correctly?
-
Have all snags been cleared and signed off both BPC and the client?
-
Have works been handed over to the client and accepted?