Title Page

  • site

  • Conducted on

  • Prepared by

  • Location
  • Level

  • Area

  • Drawing no.

  • Installer Name

  • Ceiling Series

  • Ceiling Type

  • Competence Check

1.0 Pre-Commencement Check

  • Date

  • Pre-commencement checked by

  • Has the specification been finalised? Have all relevant RFI's been answered?

  • Is the area clear, accessible & unobstructed? Are exclusion zones agreed?

  • Have the correct materials been loaded out at the work area?

  • Are all materials (hangers, transition trims, C profiles, ceiling panels, insulation pads) stored in dry conditions?

  • Has the setting out been agreed, and are gridlines and datums established?

  • Has M&E sequencing been co-ordinated, & void handover received?

  • Have BPC issued the current, approved layout drawings?

  • Have BPC received full, co-ordinated & dated trade handovers?

5.0 Completion & Handover

  • Date

  • Handover completed by (BPC Manager/Supervisor)

  • Has the work been adequately protected on completion of installations?

  • Have all BPC works been snagged and de-snagged by BPC, before handover to Overbury?

  • Have all snags been cleared and signed off by both BPC and the client?

  • Have works been handed over to the client and accepted?

  • Checked by Overbury Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.