Title Page
-
1 Broadgate
-
Conducted on
-
Prepared by
-
Location
-
Level
-
Area
-
Drawing Number
-
Installers Name
-
Competence Check
-
Wall Type
1.0 Pre-commencement checks
-
Date
-
Pre-commencement checks, check by
-
Has specification been finalised? have all the relevant RFI's been answered?
-
Have benchmark areas been agreed with principal contractor, in situ for each wall type?
-
Is area clear, accessible & Unobstructed? Are exclusion zones agreed.?
-
Have correct materials and plant been loaded out at the work area?
-
Are materials (plasterboard, metal sections, accessories, plaster) stored in dry conditions?
-
Are primers and ready-mix materials protected from freezing conditions.?
-
Has setting out been agreed, and are gridlines and datums established.?
-
Has the builders' works information been received.?
-
Has M & E Sequencing been co-ordinated, & void handover received?
-
Have BPC received the current, approved layout drawings?
-
Have BPC received, full, co-ordinated & Date trade handover?
-
Has the steel work installation been completed, and the QA handover to BPC been completed?
2.0 First Fix Frame Work
-
Date
-
Work installed by
-
Has wall been set out to correct dimension off gridline
-
Have the correct, approved fixing's been used to secure tracks & channels to the structure?
-
Have the correct , approved fixings been used to secure steel wind post/intermediate steel feet and head brackets to structure?
-
Where 94mm or 148mm channels are being installed, are the fixings at 300mm staggered centres?
-
Are all head track fixing's at 300mm centres?
-
Has BG fire strip been installed between the Head track and structure?
-
Has the steel wind post/intermediate steel been installed correctly, and to specification?
-
Have the correct size & gauge of channels & studs been used (check against specifications)?
-
Have all starter & tabbed starter channel been cut short to accommodate any required deflection head detail?
-
Are the studs centres correct as per the specification, taking into account any localised variation to areas such as ceramic/wall tiling, or specific loadings?
-
Where a deflection head is required, have the studs been cut short of the soffit?
-
Where a deflection head is required, ensure there are no fixing's connecting the studs to the head tracks?
-
If required, have coreboard/Glasroc strips been installed within the head track, to maintain fire integrity through the deflection head detail?
-
Where a deflection head is required, has a BG noggin been used to maintain a 300mm fixing centres ( up to 120minutes)?
-
Where a deflection head is required, has a drop soffit been formed, to maintain a minimum 5mm overlap on the face of the the boards?
-
Has the correct splicing detail been used, where I studs are extended (60mm, 70mm, 92mm: remove flanges, and overlap by 200mm, fixed with 4no BG wafer head jack-point screws. 146mm: splice with 1m section of G105 retaining channel, fixed with BG wafer head Jack-points screws)?
-
Have starter channels been used on all abutments and external corners?
2.1 Medium Duty Door Details
-
Date
-
Work installed by
-
Have full height studs been installed either side of the door opening, and are they fixed into the base channel using either BG wafer head drywall screws (c-studs) or BG wafer head jack-point screws I studs)?
-
At the door head, has a BG channel installed, snipped and bent 150mm down the side of the studs, and fixed twice?
2.2 Heavy Duty/Severe Door Details
-
Date
-
Works installed by
-
Has the floor channel , either side of the door opening, been fixed with four fixings?
-
Has the floor channel been cut and returned 300mm up side of the the door stud, and fixed?
-
At the door head, has a BG channel been installed, bent 150mm down the side of the studs, and fixed twice?
3.0 Core Board Installations
-
Date
-
Works installed by
-
Where required, has Gyproc sealant been applied around the perimeter of the framework, prior to boarding?
-
Are core boards finished cut short within the head track, to accommodate the design deflection?
-
Have the correct retaining channel been installed. to retain the core board into the studs, are they cut short of the bottom of the fire stops to accommodate the designed deflection?
-
Have BG GA3 angle sections, and 122mm wide core board strips, bedded on Gyproc sealant, been installed on the horizontal joints in the coreboard?
-
Are the walls square and plumb, are they within tolerance of +-3mm?
First Fix Completion Handover Issued
-
Date
-
Checked By (BPC Manager/supervisor)
4.0 Pre-second Fix & Service Check
-
Date
-
Works installed by
-
Have we received the service containment Handover documents?
-
Have the correct materials and plant been loaded out at the work Area?
-
Has insulation Installation been completed?
-
If required, are any timber noggins/pattresses installed?
5.0 Second Fix Boarding & Close Up
-
Date
-
Has void closure been issued.
-
Works installed by
-
If carried out during the closing up stage, has the correct insulation been installed?
-
Are screw centres at a maximum of 300mm centres, and 200mm centres at external corners?
-
Where the specification is for a single layer of board either side of the studs, has a BG GFS1 fixing strap been used at horizontal board junctions?
-
where the specification is for a single layer of board either side of the studs, has a BG GFS1 fixing strap been used at horizontal board junctions?
-
Where the specification is for a double layer of board either side of the studs, has a BG GFS1 fixing strap been used at the horizontal board Junctions?
-
Where the specification is for a double layer of board, are joints staggered by 600mm minimum 300mm?
-
Has additional board been installed to allow for recess skirting. (check specification).
-
Have the fire stop holorib sections been inserted into the decking profile, above the head track, and sealed with intumescent mastic?
-
Are the walls square and plumb, are they within tolerance +-3mm?
-
Have 2 no. 50mm wide strips of 30mm Glasroc F Firecase suitably fixed through to the soffit using fire resistant fixings @ 600mm centres been installed either side of the partition?
-
Where required, have the correct service support pattresses been installed?
-
If required, are any structural or service openings correct and within tolerance?
Second Fix Completion Handover Issued
-
Date
-
Checked by (BPC manager/supervisor)
6.0 Beads & Edge/Reveal Trims & skirting.
-
Date
-
Works installed by
-
Have the beads or trims been checked against the specification, are they correct?
-
Are any shadow gaps at a constant width?
-
Are all trims plumb, level, and straight?
-
Are all mitres neat and tight fitting, with no lipping?
-
Are all screw heads sufficiently recessed into leg of trim?
7.0 Tape & Joint Finish
-
Date
-
Works installed by
-
Is the area clear, accessible & unobstructed? are exclusion zones agreed?
-
Are the site lighting levels adequate for a satisfactory inspection?
-
Has Benchmark areas been agreed, in-situ, and approved by the main contractor?
-
Are site conditions suitable for the application of finishes - humidity, temperature, ETC.?
-
Has paper tape been correctly applied and bedded in?
-
Have any excess filler been removed to leave surfaces mostly flat?
-
Has sufficient drying time (min. 24 hours), given between coats?
-
Have all beads been covered?
-
Has light sanding been completed, leaving no edges?
-
Have any minor imperfections been filled?
-
Does the final jointed coat, feather out beyond the first application?
-
Has final sanding been completed to leave a smooth continuous surface?
-
If required, has drywall primer or sealer been applied, prior to hand over to the following trades, for decoration?
-
Does the finish meet the standard agreed at benchmark?
-
Is protection required to salient angles?
8.0 Completion and Handover
-
Date
-
Handover completed by (BPC manager/Supervisor)
-
Has the work been adequately protected on completion of installation?
-
Have works been snagged and recorded correctly?
-
Have all snags been cleared and signed off both BPC and the client?
-
Have works been handed over to the client and accepted?