Title Page

  • site

  • Conducted on

  • Prepared by

  • Location
  • Level

  • Area

  • Drawing Number

  • Installers Name

  • Competence Check

  • Doors Number

1. Pre-commencement check

  • date

  • Pre-commencement checked By

  • Has the specification been finalised ? Have all the relevant RFI's been answered ?

  • have benchmark areas been agreed with Principal contractor, in situ for each door type.?

  • Is the area clear, accessible & unobstructed? Are exclusion zones agreed ?

  • have the correct doors, frames and plant been loaded out at the work area ?

  • Are materials (riser doors and frames) stored in dry conditions ?

  • Has the setting out been agreed and are gridlines and datums established ? have any necessary equipment calibration checks been carried out. ?

  • Have BPC received the current, approved layout drawings, ?

  • Have BPC received , full , co-ordinated & dated trade handover documents

2. First fix frames & Doors

  • Date

  • Works installed by

  • Is Structural opening size correct (check latest door schedule & Reflective ceiling plan's, structural opening checks have sticker to inside of opening from QA checks from (QWC-001) & (QWC-002) for walls & (QWC-007) for MF ceilings.?

  • Is the frame (double or single) within tolerance to the structural opening Maximum gap allowed 10mm. ?

  • Outside of the frame - has the frame been fixed @ 300mm centres and 150mm from corners and are correctly imbedded to allow for Tape and Jointing works ( screws minimum 75mm long, minimum penetration through stud work 35mm, 4.2mm dia). ?

  • Inside of Frame - have the levelling/frame adjusters been twisted back using the Hex key to Kiss the opening.?

  • Inside of frame - have fixings been installed through the levelling frame adjusters with a minimum embedment of 35mm. ?

  • Ensure frame is level and square ready to house the doors

3.0 install of doors to frames

  • Date

  • Works installed by

  • Base pivot - ensure the 3mm washer are in place. ?

  • Head pivot - Ensure retractable snap pivot is fully is fully engaged (check by the back of the door the pin is to the top of the dog leg). ?

  • Spacing around door to frame - ensure spacing around the doors are 3mm tolerance +-1mm. ?

  • Ensure when doors are shut the leaf's marry up with no step and the doors finish flush with frame when closed. ?

  • Ensure doors are protected. ?

  • Ensure euro cylinders are installed and functioning. ?

4.0 Completion and handover

  • Date

  • Handover completed by (BPC manager)

  • Have works been snagged and recorded correctly. ?

  • Have all snags been cleared and signed off by both BPC and the client. ?

  • Have works bee handed over to the client and accepted. ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.