Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Plot Number

  • Bricklayers Name

  • Lift

  • Percentage complete

Untitled Page

  • Is Brickwork Plumb and Level

  • Are opening reveals correct

  • Are cavities clean from debris

  • Has the working area been left clean and tidy

  • Have all trays been fitted correctly

  • Is the vapor membrane free from tears

  • Have all wall ties been installed correctly

  • Are lintels level and clipped back to timber frame

  • Has building control inspected the lift

  • Has loading bay been cleared of material

  • Additional Comments

  • Site Managers Signature

  • Bricklayers signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.