Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Plot Number
-
Bricklayers Name
-
Lift
-
Percentage complete
Untitled Page
-
Is Brickwork Plumb and Level
-
Are opening reveals correct
-
Are cavities clean from debris
-
Has the working area been left clean and tidy
-
Have all trays been fitted correctly
-
Is the vapor membrane free from tears
-
Have all wall ties been installed correctly
-
Are lintels level and clipped back to timber frame
-
Has building control inspected the lift
-
Has loading bay been cleared of material
-
Additional Comments
-
Site Managers Signature
-
Bricklayers signature