Title Page

  • Conducted on

  • Prepared by

  • Location
  • Are bricklayers brushing down bricks?

  • Is there power on site ?

  • Pier light provision cable installed?

  • Is dpc flashing coming out of bricks two courses above slab step down at slab level?

  • Has Hot water recess box been provided?

  • Length of walls maximum 6m to each expansion joint?

  • Bricklayers not removing windows outside of wall frame and or pushing inside frame to fit lintels in?

  • Is wakaflex required for lower roof and first floor?

  • Are bricklayers locking gates at days end?

  • Are bricklayers removing scaffolding planks?

  • Is hoop iron is installed ?

  • Are they brushing bricks ?

  • Are they throwing cut out bricks in bin?

  • Is site cleaned?

  • Are they installing weepholes ?

  • Are they covering cement bag at end of day?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.