Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
FRAMING CHECKLIST
-
Frames erected plumb and straight
-
Building parallel and check square
-
Kitchen frames square and straight
-
Bathrooms square and straight
-
All partitions and corners nailed off straight
-
Tie downs done
-
Sheet braces in place and nailed correctly
-
Hold down bolts in correct positions/tight
-
Ridge line tied together, trusses plumb
-
Shower position correct
-
Road left clean
-
Strap bracing as per plan and tensioned
-
Triple grips and cyclone ties on
-
Extra eave nogging for larger eave areas
-
Top plates straight and nailed off
-
Joist hangers as shown on pre cut plan
-
Valley / Hips / Gables straight
-
Frame treatment as per spec
-
Termite treatment in place
-
Check frame overhangs are in tolerance (10mm)
-
Check the meterbox is framed correctly
-
Alfresco posts - check type/bricks are correct
-
Check that bolts/coach bolts are to all beam post connections
-
Check point loads are supported
-
Check bulkheads are installed correctly and are straight and level
-
Job left clean, rubbish in bin
-
GJ sign and danger sign up
-
Site left in same manner
OTHER ITEMS
-
Document any other areas of concern using notes/photos as appropriate
COMPLETION SIGNATURE
-
Supervisor Signature
-
Date completed