Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
CARPENTER CHECKLIST
-
Bath cradle framed correctly; checked supporting blocks
-
Point loads supported correctly
-
Check walls for bowed studs / protruding nogs
-
Doorway frames fixed to floor each side
-
Doors checked trim height / width
-
Garage door noggin correct / solid
-
Additional noggin as required
-
Wrap lapped correctly/tight
-
Sliding doors adjusted/locking
-
Front door operation check
-
Construction key checked
-
Windows plumb and level
-
Floors swept
-
Check orders/plans for non-standard items
-
Photograph noggins for towel rails, TV's etc.
-
Garage slab protection in place, if applicable
-
Feature cladding as per plans
-
Eaves completed
-
Site left in safe manner
-
GJ sign and danger sign up
-
Job left clean
OTHER ITEMS
-
Document any other areas of concern using notes/photos as appropriate
COMPLETION SIGNATURE
-
Supervisor Signature
-
Date completed