Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

CARPENTER CHECKLIST

  • Bath cradle framed correctly; checked supporting blocks

  • Point loads supported correctly

  • Check walls for bowed studs / protruding nogs

  • Doorway frames fixed to floor each side

  • Doors checked trim height / width

  • Garage door noggin correct / solid

  • Additional noggin as required

  • Wrap lapped correctly/tight

  • Sliding doors adjusted/locking

  • Front door operation check

  • Construction key checked

  • Windows plumb and level

  • Floors swept

  • Check orders/plans for non-standard items

  • Photograph noggins for towel rails, TV's etc.

  • Garage slab protection in place, if applicable

  • Feature cladding as per plans

  • Eaves completed

  • Site left in safe manner

  • GJ sign and danger sign up

  • Job left clean

OTHER ITEMS

  • Document any other areas of concern using notes/photos as appropriate

COMPLETION SIGNATURE

  • Supervisor Signature

  • Date completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.