Information
-
Site Address
-
Job No.
-
Conducted on
-
Prepared by
Safety/General
Carpenter Details
-
Carpenter Company used on this job?
- Simone Constructions
- Dreamworks
- Robinsons Carpentry
- MST Building
- Skyview Building
- Fyner Constructions
- Cornells Constructions
- Other
-
Other, please note carpenter company if not on list.
General/Safety
-
1.01 Have you received a copy of the bracing detail?
-
1.02 Is site fencing intact and secure at all points?
-
1.03 Was Gate Locked?
-
1.04 Has all rubbish been placed in designated area including food scraps?
-
1.05 Has the house been swept out and site left clean and safe?
-
Book Timber Clean
Ground Floor
Frame inspection
-
Have all steel beams been adequately propped by scaffold?(T-bars over 3.6m to be propped by scaffold)
-
Have steel posts been braced within straps and blocked out with timber?
-
Are steel posts adequately bolted/welded?
-
Will top plates to steel posts interfere with cornice/square set?(check type of cornice)
-
Are frames square, straight and plumb? (level check at least all tiled areas)
-
Are bracing units in place and installed correctly?<br>
-
Are all dyna bolts adequately secured where required? (check for adequate washers)
-
Are room sizes and doorway opening to size and correct placement?<br>
-
Are all noggins in place?
-
If niches are external walls, have they been blocked prior to brickwork?
-
Have all trusses been installed plum and straight?
-
Has bracing, triple grips, L bracket and shear blocks been installed correctly? (lower roof)
-
Has all roof bracing been installed and nailed off wrapped under top plate?
-
Has man hole been installed, blocked down and marked on floor?
-
Have change of direction blocks been installed?<br>
-
Have all remaining timbers been stacked neatly?
-
Are all windows/sliding doors installed correctly with ledgers under and fixed with galvanized nails?
-
Has alcor flashing been cut into reveals of sliding doors and installed level?<br>
-
Are sliding door sashes stacked neatly and secured?
-
Are glass panels free from scratches?
-
Are window and door frames free from scratches and dents?
-
Have you considered for any light points to brick piers? (Check electrical layout)
-
Can brickwork be started without pinning for brickwork? Note: less than 920mm
-
if No, you must book Surveyor
-
Have all carpentry items on the ground floor been completed? (itemized list and photos)
-
Add media
First Floor
Frame Inspection (First Floor)
-
Has the floor joist system been installed correctly? (check beams, joist, joist hangers, blocking and bracing)
-
Is void protection in place and ladder secured? (note: Ladder must protrude 900mm above platform)
-
Are frames square, straight and plumb? (level check at least all tiled areas)
-
Have room sizes been checked for size and doorway opening to size and placement?
-
Are all noggins in place?
-
If niches are external walls, have they been blocked prior to brickwork?<br>
-
Are bracing units in place and installed correctly?
-
Are all windows/sliding doors installed with ledgers and galvanized nails?
-
Has alcor flashing been cut into reveals of sliding doors and installed level?
-
Are sliding door sashes stacked neatly and secured?
-
Are the glass panels free from sratches?
-
Are the window and door frames free from dents and scratches?
-
Have all trusses been installed plumb, straight and braced?
-
Has all roof bracing been installed and nailed off wrapped under top plate?<br>
-
Has bracing, triple grips, L brackets and shear blocks been installed correctly?
-
Have change of direction blocks been installed?
-
Has manhole been installed blocked down and marked on the floor?
-
Has high load brackets been adequately bolted?
-
Have all carpentry items to the top floor been completed? (write detailed list and photos if required here)
Comment and sign off
Comments
-
Can this job be processed for payment?
-
Insert any comments here
-
Photos any of additional information required.
SIGN OFF
-
Site supervisor.